Top Farm Higham Lane, Nuneaton, Warwickshire Data via plota.co.uk

26/0039/ARM - Approval of Reserved Matters Pending Consideration

Proposal

Approval of Reserved Matters (Appearance, Layout, Scale and Landscaping) for Phase 3a comprising the construction of a Mixed-Use District Centre comprising 4 Commercial Units (totalling GIA 936.12 sqm), a Nursery (GIA 512.63 sqm) plus associated external play-area, car parking, bike shelters, bin stores, plant room, sustainable surface water and foul drainage infrastructure, utilities infrastructure, hard and soft landscaping, and ground remodelling and other enabling works, pursuant to outline planning permission Ref: Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Jul 2026
Decision
Target date was 13 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 107.

Documents 38

Plans & drawings 23

PDF 211401-02 Framework Travel Plan FINAL REV A.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 57439_T_Rev0-A1.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF P25-326-R01v2 Top Farm Nuneaton - Retail and Nursery Development (1).pdf Plans/Documents · 15 Jul 2026 View ↗ PDF BEA-26-001-01 (P04) - Landscape Strategy Plan.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 25065-E701-P01 - EXTERNAL LIGHTING CALCS andCONTOURS (1).pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 11004-PH2ES-800-104 - Contour_Plans.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 11004-PH2ES-800-105 - Contour_Plans.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 11004-PH2ES-800-102 -Longitudinal_Sectins Sheet 2 of 3.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 11004-PH2ES-800-103 -Longitudinal_Sectins Sheet 3 of 3.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 11004-PH2ES-800-101 -Longitudinal_Sectins Sheet 1 of 3.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-FRA and SUDS Strategy ISSUE v1 Inc Apps.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF 003 AF6580-Outline Fire Safety Strategy-I02.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0533 - MH Schedule.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0542 - Surface Water Catchments.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0541 - Exceedance Flow.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0525 - External Works Details.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0510 - Proposed External Levels P03.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF SBK-25-226-0520 - External Works Plan.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF WDG07 - PL001A - Top Farm Site Location Plan.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF WDG07 - PL005A - Top Farm Site Elevations.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF WDG07 - PL003D - Top Farm Proposed Elevations Rev D.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF WDG07 - PL002E - Top Farm Site Block Plan Rev E.pdf Plans/Documents · 15 Jul 2026 View ↗ PDF Top Farm_AQA_12.05.2026_Final.pdf Plans/Documents · 15 Jul 2026 View ↗

All documents on the council site ↗

Associated applications 13

Site constraints 3

Lincolnshire Wolds National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Nuneaton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Nuneaton
Application type
Approval of Reserved Matters
Received
14 Jul 2026
Validated
14 Jul 2026
Ward
Milby
Case officer
Show
Target decision
13 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Framptons Town Planning

Decision outlook

Day 107, past the statutory target. 56% of commercial premises in Nuneaton are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 10751 days past the 56-day target
38%decided within 8 weeks
91%approved
5%go to committee

Plota live figures for commercial premises decided by Nuneaton in the last twelve months, from validation. Nuneaton decision record →

Consultation & key dates

Statutory expiry
13 Oct 2026
Nuneaton
Planning Authority Score
5.2/10
Average
#138 of 296 councils
Relevant to this application:
Major dwellings

Nuneaton ranks #168 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Nuneaton decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #24 of 296
97%
Householder approved
Above avg (90%) #40 of 296
62%
Decided in 8 weeks
Below avg (63%) #168 of 296
48%
Extended time limit
Above avg (41%) #216 of 296
80%
Minor dwellings approved
15 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
25 decided
306
Total decisions
16 refused in the year to March 2026