37 Lovelace Road Long Ditton Surbiton Surrey KT6 6NZ and 1 Beechwood Close Long Ditton Surbiton Surrey KT6 6PF Data via plota.co.uk

2026/1222 - Full Application Refused

Proposal

Demolition of the existing properties at No. 37 Lovelace Road and No. 1 Beechwood Close and the erection of a replacement apartment block comprising 14 residential units with access from Lovelace Road and vehicular access from Beechwood Close, associated parking, cycle storage, refuse storage and amenity areas with hard and soft landscaping, and associated engineering and infrastructure works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 May 2026
✓
Validated
23 Jun 2026
✗
Refused
13 Oct 2026
Appeal
Not lodged

Refused on 13 Oct 2026 · Last checked 17 Oct 2026

Planning committee

Decided by Elmbridge Planning Committee on 13 Oct 2026.

Refused

Against officer advice: officers had recommended approval.

  • Officers advised granting permission because the proposal would provide housing in a sustainable location without identified material harm, subject to a legal agreement.
  • The committee refused permission contrary to the officer recommendation, citing poor design, amenity harm, inadequate accommodation and the missing biodiversity agreement.

Source: Plota analysis of Elmbridge's committee minutes, Elmbridge Planning Committee minutes, 13 October 2026 .

Site constraints 5

Southborough Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Tree preservation order about 9 m away; 1 listed building within 150 m of the postcode pin; Inside the Kingston upon Thames built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Elmbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Elmbridge
Application type
Full Application
Postcode
KT6 6NZ
Received
21 May 2026
Validated
23 Jun 2026
Ward
Long Ditton Ward
Decision
Refuse Planning Permission
Decision date
13 Oct 2026

How this decision compares

Decided in 112 days from validation, 50 days slower than Elmbridge's median of 62 for demolitions. Refused, as 24% of demolitions here are.

42%decided within 8 weeks
76%approved
233decided in the last year

Plota live figures for demolitions decided by Elmbridge in the last twelve months, from validation. Elmbridge decision record →

Elmbridge
Planning Authority Score
2.6/10
Poor
#247 of 296 councils
Relevant to this application:
Householder decisions

Elmbridge ranks #195 out of 296 councils for householder decision speed. Elmbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.

One of the strictest councils
only 79% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Elmbridge decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #277 of 296
79%
Householder approved
Below avg (90%) #281 of 296
57%
Decided in 8 weeks
Below avg (63%) #195 of 296
44%
Extended time limit
Above avg (41%) #178 of 296
68%
Minor dwellings approved
195 decided (1-9 homes)
60%
Major dwellings approved
15 decided (10+ homes)
72%
Change of use approved
32 decided
1,358
Total decisions
314 refused in the year to March 2026