MOSSLANDS SCHOOL Mosslands Drive, Wallasey Village, Wallasey, Wirral, CH45 8PJ Data via plota.co.uk

NMA/26/01470 - Non Material Amendments Pending Consideration

Proposal

Demolition of existing school and erection of new Mosslands School including 3-storey main building, 2no. sports halls; formation of new and replacement playing fields and sports facilities; provision of new car park, cycle parking; and ancillary works. Replacement playing fields and pitches at Wallacre recreation ground, including ground remodelling, drainage installation, replacement pavilion, new footpaths, and ancillary work. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Oct 2026
Decision
Expected by 4 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 9 Jan 2027 and 10 Feb 2027, from Wirral's recent commercial and major works.

Comments are open until 31 Oct 2026

Comment on this application ↗

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project: Mersey Tidal Power Project, at pre-application.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wirral - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wirral
Application type
Non Material Amendments
Postcode
CH45 8PJ
Received
7 Oct 2026
Validated
7 Oct 2026
Ward
Liscard
Case officer
Show
Target decision
4 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Plan Red Ltd
Freehold owner
Show

Decision outlook

Day 21 of the 56-day target. Wirral usually decides commercial and major works by day 108.

Day 2187 days to the predicted decision (day 108)
21%decided within 8 weeks
95%approved
8%go to committee

Plota live figures for commercial and major works decided by Wirral in the last twelve months, from validation. Wirral decision record →

Consultation & key dates

Comments by
31 Oct 2026
Statutory expiry
4 Nov 2026
Wirral
Planning Authority Score
3.3/10
Poor
#227 of 296 councils
Relevant to this application:
Householder decisions

Wirral is slower than most councils at deciding householder applications, ranking #200 out of 296. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wirral decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #164 of 296
90%
Householder approved
Above avg (90%) #198 of 296
57%
Decided in 8 weeks
Below avg (63%) #200 of 296
45%
Extended time limit
Above avg (41%) #197 of 296
62%
Minor dwellings approved
47 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
77%
Change of use approved
61 decided
909
Total decisions
112 refused in the year to March 2026