Land at Mount Road Manchester M18 7QR Data via plota.co.uk

OTH-2026-001204 - Approval of details reserved by a condition Under Consultation

Proposal

Discharge of Condition 25 (surface water drainage) and 26 (drainage maintenance) in relation to phases 1 and 2 of Planning Permission 142998/JO/2025. Data via plota.co.uk

View original council record ↗

Application progress

Received
31 Jul 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 49

Statements & assessments 41

PDF 30571_1_2F_Highway And Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_13_Section 104 Agreement Plan (Rev E).pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_4A_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_3B_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_4D_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF Mount Road CCTV MARK UP.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_18G_SW Pump Station Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_3A_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_7B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF DS25-NW-199174-WW.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_2B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF REV 7 FD056 Mount Road Gorton (1)_compressed.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_5_3B_Surface Water Manhole Schedules.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_3C_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_8B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_7_2A Control Manhole Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF Technical Design Document - Mount Road Gorton Rev. B.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_12_1 Offline Attenuation Tank Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF Completed 29_01_2026 - S104 Agreement - Signed by ESP(166581409.1).pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571 Proposed SW Network 1 240410.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_1D_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571 Proposed SW Network 2 240222 into Pump Station.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF A0 Sheet 1 to 500 Scale As Built Survey S25 0348 Rev C Mount Road Gorton.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_5B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF MOUNT ROAD GORTON DRAINAGE REPORT.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_5_4C_Surface Water Manhole Schedules.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_5_2B_Surface Water Manhole Schedules.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_5_1E_Surface Water Manhole Schedules.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_16A_Typical Drainage Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_7_1 Control Manhole Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_20_Washout Chamber Detail.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_12_3A Offline Attenuation Tank Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 24-073-1 Pumping Station Details Rev F.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_1_1I_Highway And Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_2C_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_1B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_12_2A Offline Attenuation Tank Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_9_5D_Domestic Drainage Layout.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_7_1E_Control Manhole Details.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_19A_Excedance Storm Flood Routing Plan.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗ PDF 30571_3_6B_Long Sections.pdf Flood Risk Assessment or Drainage · 31 Jul 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Manchester - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
Manchester
Application type
Approval of details reserved by a condition
Postcode
M18 7QR
Received
31 Jul 2026
Validated
31 Jul 2026
Ward
Longsight
Case officer
Show
Target decision
25 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 23 Aug 2026

Read the comments on the council site ↗

Manchester
Planning Authority Score
6.8/10
Good
#68 of 296 councils
Relevant to this application:
Major dwellings

Manchester ranks #146 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Manchester decision performance
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #174 of 296
95%
Householder approved
Above avg (90%) #84 of 296
65%
Decided in 8 weeks
Above avg (63%) #146 of 296
31%
Extended time limit
Below avg (41%) #59 of 296
76%
Minor dwellings approved
82 decided (1-9 homes)
94%
Major dwellings approved
54 decided (10+ homes)
65%
Change of use approved
49 decided
1,924
Total decisions
242 refused in the year to March 2026