APP/26/00771 - Householder planning permission Under Consultation

Proposal

Side and rear extension to form new garage, and infill extension to extend rear elevation beneath existing roof canopy. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Oct 2026
✓
Validated
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Dec 2026 and 11 Jan 2027, from Havant's recent extensions.

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Public footpath about 21 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project about 899 m away: Hampshire Water Transfer and Water Recycling Project
The site is about 899 m from the project boundary. Dam or reservoir, accepted for examination. Also within 2 km: AQUIND Interconnector (awaiting the Secretary of State's decision, about 962 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Waterlooville built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 23 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area88 m² (947 sq ft)
Energy ratingD (59 out of 100), could reach C
PropertyDetached bungalow, 5 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in June 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Householder planning permission
Postcode
PO7 5JW
Received
15 Oct 2026
Validated
23 Oct 2026
Ward
Purbrook
Case officer
Show
Target decision
18 Dec 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 5 of the 56-day target. Havant usually decides extensions by day 73.

Day 568 days to the predicted decision (day 73)
37%decided within 8 weeks
96%approved
236decided in the last year

Plota live figures for extensions decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Havant
Planning Authority Score
3/10
Poor
#235 of 296 councils
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions, ranking #283 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.