Waters Edge House Hull Road Hornsea East Riding Of Yorkshire HU18 1RJ Data via plota.co.uk

26/30276/CONDET - Approval of Details req'd by Condition Approved

Proposal

Submission of details required by Conditions 3 (Construction Environmental Management Plan (CEMP: Biodiversity)), 4 (Wildlife Enhancement Plan (WEP)), 5 (discharge of surface water) and 8 (materials and construction methods - car port) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jun 2026
✓
Validated
8 Jun 2026
✓
Approved
24 Jul 2026

Approved on 24 Jul 2026 · Delegated Decision · Last checked 30 Jul 2026

Associated applications 2

  • Part of

    Fullcouncil archive

    Conditions 3, 4, 5, 8 discharged

    • ConditionsSubmission of details required by Conditions 3 (Construction Environmental Management Plan…This application26/30276/CONDET

Site constraints 8

Nutrient neutrality catchment: Hornsea Mere SPA
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special protection area 17 m away: Hornsea Mere
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 17 m away: Hornsea Mere SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Scheduled monument 111 m away: Medieval settlement of Southorpe and field system, north east of Southorpe Farm
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Hornsea built-up area; Priority habitat 9 m away: No main habitat but additional habitats present; National infrastructure project 1785 m away: Dogger Bank D Wind Farm, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details req'd by Condition
Postcode
HU18 1RJ
Received
4 Jun 2026
Validated
8 Jun 2026
Ward
North Holderness
Parish
Hornsea Town Council
Case officer
Show
Target decision
3 Aug 2026
Decision
Approve
Decision date
24 Jul 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 30 Jul 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14976467
Planning Portal ref
PP-14976467
Comments by
29 Jul 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use