Land Rear Of Power Station Hobson Way Stallingborough North East Lincolnshire Data via plota.co.uk

DM/0610/26/DCODID - Dets in Discharge - Dev Consent Order Pending Consideration

Proposal

Discharge of Development Consent Order (DCO) Requirement 15 (Construction Environmental Management Plan) and Requirement 16 (Construction Traffic Management Plan) within Schedule 2 of The South Humber Bank Energy Centre Order 2021 (the 'Order) which came into force on 2 December 2021 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Jul 2026
✓
Consultation
19 Aug 2026
Decision
Expected by 25 Sept 2026

Under consideration

No decision has been issued yet. A decision is expected by 25 Sept 2026.

The consultation period closed on 12 Sept 2026.

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: South Humber Bank Energy Centre
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP) (at pre-application, the site is inside its boundary); H2East Pipeline: Humber to Nottinghamshire (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Special area of conservation 472 m away: Humber Estuary; SSSI 472 m away: Humber Estuary - 2000480 SSSI; Inside the Grimsby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Dets in Discharge - Dev Consent Order
Received
31 Jul 2026
Validated
31 Jul 2026
Ward
Immingham
Parish
Stallingborough Parish Council
Case officer
Show
Target decision
25 Sept 2026
Applicant
Show
Agent
DWD - Callum Cook

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
19 Aug 2026
Comments by
12 Sept 2026
Statutory expiry
25 Sept 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026