275 Pentonville Road London Camden N1 9NL Data via plota.co.uk
Proposal
Temporary decorative scaffold shroud comprising a printed replica 1:1 photographic image of the building facade with an inset advertising area measuring 10x6.4 metres for a period of 9 months during external refurbishment and maintenance to the building. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicts a decision between 10 Nov 2026 and 28 Nov 2026, from Camden's recent signs and adverts.
Site constraints 11
Show all 15 with distances
- 15 mBig Chill HouseGrade II
- 46 mWilling House and Attached Wall With RailingsGrade II
- 52 m272 to 276, Pentonville Road and Scottish Stores Public House 2 to 4, Caledonian RoadGrade II
- 94 m7, Caledonian RoadGrade II
- 95 mNumbers 1-7 and Attached Railings Including Midland Hotel (Numbers 2-5) and Clifton Hotel (Number 7)Grade II
- 101 mNumbers 13 and 14 and Attached RailingsGrade II
- 111 m295 AND 297, PENTONVILLE ROAD (See details for further address information)Grade II
- 113 mNumbers 18 to 24 (Consecutive) and Attached RailingsGrade II
- 120 mFormer Welsh Congregational Union Chapel (Eglwys Y Tabernaacl)Grade II
- 124 mNumbers 1-7 and Attached RailingsGrade II
- 125 mUnnamed
- 126 m173-179, Kings Cross RoadGrade II
- 128 mNumbers 1 to 17 (Consecutive) and Attached RailingsGrade II
- 132 m27-53, Northdown StreetGrade II
- 148 m75, Wicklow StreetGrade II
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Camden - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Kelvin House 123 Judd Street London WC1H 9NP
Details for condition 34 (Groundborne Noise Assessment) of planning ref 2025/381...
McGlynn's Free House 1-5 Whidborne Street London WC1H 8ET
Installation of 4no. retractable canvas awnings to front and side elevations of ...
3 Killick Street, London, N1 9FG
Replacement of the existing external wall insulation and cladding with non-combu...
Great Northern Hotel Pancras Road London N1C 4TB
Installation of 1 x non-illuminated fascia sign measuring 300mm x 95mm and insta...
73-77 Euston Road London NW1 2QS
Display of 7x externally illuminated fascia signs, 2 x internally illuminated pr...
3-5 Mcglynn's Whidborne Street London Camden WC1H 8ET
Installation of 4no. retractable canvas awnings to front and side elevations of ...
Important details
Decision outlook
Day 16 of the 56-day target. Camden usually decides signs and adverts by day 52.
Plota live figures for signs and adverts decided by Camden in the last twelve months, from validation. Camden decision record →
Consultation & key dates
- Comments by
- 14 Oct 2026
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Camden is slower than most councils at deciding householder applications, ranking #242 out of 296. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
Track this application
275 Pentonville Road London Camden N1 9NL
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

Comments are open until 14 Oct 2026