2026/1577 - Discharge of Condition Approved

Proposal

Submission of details pursuant to conditions 27 (Sound Insulation Measures), 29 (Sustainable Drainage Systems) and 35 (Piling Method Statement) of planning application 2025/1821 dated 15-07-2026 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jul 2026
✓
Validated
13 Aug 2026
✓
Approved
20 Oct 2026

Approved on 20 Oct 2026 · Delegated · Last checked 21 Oct 2026

Documents 27

Other documents 19

PDF London-Borough-of-Hackney-Mail-Fwd-Pedro-Street-Planning-Condition-27-sound-proofing Other · 19 Oct 2026 View ↗ PDF planning/uploads/57602391786631087:: ::PED CGL Cover Letter Pre Commencement Conditions Document · 13 Aug 2026 View ↗ PDF PED-CGL-Cover Letter_Pre-Commencement Conditions.docx Other · 23 Jul 2026 View ↗ PDF PED-JCL-XX-00-D-L-000033 FURNITURE AND FEATURES.pdf Other · 23 Jul 2026 View ↗ PDF PED-JCL-XX-ZZ-L-L-000040_LANDSCAPE SPECIFICATION.pdf Other · 23 Jul 2026 View ↗ PDF PED-WSP-XX-XX-RP-C-0004 - Maintenance Strategy Report.pdf Other · 23 Jul 2026 View ↗ PDF PED-JCL-XX-00-D-L-000024 GREEN ROOF DETAIL.pdf Other · 23 Jul 2026 View ↗ PDF PED-JCL-XX-00-D-L-000020 PLANTER BUILDUPS.pdf Other · 23 Jul 2026 View ↗ PDF Pedro St Arbo Tree officer inspection visits 16.07.26.pdf Other · 23 Jul 2026 View ↗ PDF Clapton Park Site Pedro Street Hackney E5 0BD BS5837 17104_25 AIA AMS.pdf Other · 23 Jul 2026 View ↗ PDF 17104_25_Addendum_01 - Pedro Street - Addendum Report for Remediation Strategy.pdf Other · 23 Jul 2026 View ↗ PDF PED-CGL-Z0-00-D-A-PL0300-PROPOSED SEPARATING WALL FLOOR AND CEILING TYPES_P01.pdf Other · 23 Jul 2026 View ↗ PDF Pedro Street - Water and Sewer.pdf Other · 23 Jul 2026 View ↗ PDF WSP Direct Sewer Connections D-C-500509 P02.pdf Other · 23 Jul 2026 View ↗ PDF TWA Combined Sewer Asset.pdf Other · 23 Jul 2026 View ↗ PDF Thames Water Email.pdf Document · 23 Jul 2026 View ↗ PDF Piling Spec Rev P01.pdf Other · 23 Jul 2026 View ↗ PDF CJS-RP-260507-01 - Pedro Street - Acoustic Design Report.pdf Other · 23 Jul 2026 View ↗ PDF Email Correspondence with Environmental Projects Officer.pdf Document · 23 Jul 2026 View ↗

All documents on the council site ↗

Associated applications 5

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Whole of the London Borough of Hackney. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Hackney APA 3.1 Lea Valley -&nbsp
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Hackney built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Discharge of Condition
Postcode
E5 0BE
Received
22 Jul 2026
Validated
13 Aug 2026
Ward
Kings Park Ward
Case officer
Show
Target decision
8 Oct 2026
Decision
Grant
Decision date
20 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Child Graddon Lewis

Consultation & key dates

Statutory expiry
8 Oct 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026