Bridgefoot Farm Maldon Road Kelvedon Essex CO5 9BE Data via plota.co.uk

26/02394/FUL Pending Consideration

Proposal

Proposed conversion of barn into 1.No dwelling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Oct 2026
✓
Validated
19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Dec 2026, from Braintree's recent full applications.

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 35 m away: A12 Chelmsford to A120 Widening Scheme
The site is 35 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
5 listed buildings within 150 m
Nearest: Ancillary Building 5 Metres South East of Bridgefoot Farmhouse, Grade II, 43 m away · 1 Grade II*, 4 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Conservation area 13 m away: Kelvedon
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Local nature reserve 355 m away: Brockwell Meadows.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £840,000 in May 2024. Other property, freehold.

20 May 2024£840,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area182 m² (1,959 sq ft)
Energy ratingF (30 out of 100), could reach D
PropertyDetached house, 7 habitable rooms
Built1900 to 1929
HeatingElectric storage heaters
WallsTimber frame, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Braintree - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Braintree
Postcode
CO5 9BE
Received
15 Oct 2026
Validated
19 Oct 2026
Target decision
14 Dec 2026
Freehold owner
Show

Decision outlook

Day 9 of the 56-day target. Braintree usually decides full applications by day 56.

Day 947 days to the 56-day target
52%decided within 8 weeks
81%approved
37decided in the last year

Plota live figures for full applications decided by Braintree in the last twelve months, from validation. Braintree decision record →

Consultation & key dates

Statutory expiry
14 Dec 2026
Braintree
Planning Authority Score
7/10
Good
#61 of 296 councils
Relevant to this application:
Householder decisions

Braintree is faster than most councils at deciding householder applications, ranking #47 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Braintree decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #189 of 296
92%
Householder approved
Above avg (90%) #148 of 296
78%
Decided in 8 weeks
Above avg (63%) #47 of 296
33%
Extended time limit
Below avg (41%) #71 of 296
62%
Minor dwellings approved
119 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
91%
Change of use approved
11 decided
927
Total decisions
132 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.