Cycle Hire Docking Station Footway Adjacent 80 Tooley Street London Southwark SE1 Data via plota.co.uk
Proposal
Installation of a Cycle Hire docking station (21 docking points maximum and a terminal) on the footway. Data via plota.co.uk
Application progress
This application is under consideration - no decision has been issued yet. Plota predicts a decision around 8 Nov 2026, from Southwark's recent utility and infrastructure works.
Documents 8
Statements & assessments 1
Plans & drawings 6
Site constraints 12
Checked on 16 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
47 - 49 Tanner Street London Southwark SE1 3PL
Details of condition 14 (Piling) as required by planning permission ref. 25/AP/3...
Capital House 42-46 Weston Street London Southwark SE1 3QD
Details of Condition 17 'BREEAM' required by planning permission ref no. 18/AP/0...
2A More London Riverside London Southwark SE1 2DB
Works to tree with a TPO: T3 - Liriodendron tulipifera (tulip tree) T4 - Liriode...
2A More London Riverside London Southwark SE1 2DB
Works to tree with a TPO: T8 - Platanus × hispanica (London plane) T7 - Platanus...
Flat 2 4 Tanner Street London Southwark SE1 3LD
Certificate of Lawful development (Existing) for the premises comprise Flat 2, f...
171 Tower Bridge Road London Southwark SE1 2AW
Certificate of Lawful Development( proposed) for replacement of the non-complian...
Important details
Decision outlook
Day 20 of the 56-day target. Southwark usually decides utility and infrastructure works by day 54.
Plota live figures for utility and infrastructure works decided by Southwark in the last twelve months, from validation. Southwark decision record →
Public comments
No public comments yet.
Last counted 30 Sept 2026
Consultation & key dates
- Statutory expiry
- 9 Nov 2026
- Env. assessment
- No
Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).
Track this application
Cycle Hire Docking Station Footway Adjacent 80 Tooley Street London Southwark SE1
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
