Land North Of Mosley Common North Of The Guided Busway Tyldesley Data via plota.co.uk

A/25/099009/RMMAJ - Major Reserved Matters Approved

Proposal

Application for approval of the reserved matters (appearance, landscaping, layout and scale) pursuant to application ref. for the erection of 219 dwellings (100% affordable dwellings), with associated landscaping, public open space, internal access roads, car parking and associated infrastructure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 May 2025
✓
Validated
7 Aug 2025
✓
Consultation
28 Oct 2025
✓
Approved
4 Dec 2025

Approved on 4 Dec 2025 · Delegated Decision · Last checked 16 Oct 2026

Documents 179

Statements & assessments 46

PDF HERITAGE STATEMENT Supporting Report · 3 Dec 2025 View ↗ PDF PHASE 6_25.07.25-DRAINAGE LAYOUT Plans and Drawings · 1 Dec 2025 View ↗ PDF PHASE 5_27.11.25-DRAINAGE LAYOUT. Plans and Drawings · 1 Dec 2025 View ↗ PDF TRANSPORT POLICY Consultee Reply · 20 Nov 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF DRAINAGE CALCS Plans and Drawings · 28 Oct 2025 View ↗ PDF FLOOD EXCEEDANCE ROUTING Plans and Drawings · 28 Oct 2025 View ↗ PDF FLOOD EXCEEDANCE ROUTING Plans and Drawings · 28 Oct 2025 View ↗ PDF FLOOD EXCEEDANCE ROUTING Plans and Drawings · 28 Oct 2025 View ↗ PDF FLOOD EXCEEDANCE ROUTING Plans and Drawings · 28 Oct 2025 View ↗ PDF TRANSPORT POLICY Consultee Reply · 22 Aug 2025 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 1 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 2 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 3 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 4 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 5 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 6 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 7 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 8 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 9 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 10 Supporting Report · 7 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 11 Supporting Report · 7 Aug 2025 View ↗ PDF FLOOD RISK ASSESSMENT PHASE 4 14.05.2025 Supporting Report · 7 Aug 2025 View ↗ PDF FLOOD RISK ASSESSMENT PHASE 5 15.05.2025 Supporting Report · 7 Aug 2025 View ↗ PDF FLOOD RISK ASSESSMENT PHASE 6 16.05.2025 Supporting Report · 7 Aug 2025 View ↗ PDF BNG STATEMENT Supporting Report · 7 Aug 2025 View ↗ PDF AFFORDABLE HOUSING STATEMENT Supporting Report · 1 Aug 2025 View ↗ PDF BAT EMERGENCE SURVEY Supporting Report · 1 Aug 2025 View ↗ PDF BNG METRIC PHASE 6 Supporting Report · 1 Aug 2025 View ↗ PDF BNG METRIC PHASE 4 Supporting Report · 1 Aug 2025 View ↗ PDF BNG METRIC PHASE 5 Supporting Report · 1 Aug 2025 View ↗ PDF CRIME IMPACT STATEMENT VERSION B Supporting Report · 1 Aug 2025 View ↗ PDF DRAINAGE LAYOUT PHASE 6 REV D Plans and Drawings · 1 Aug 2025 View ↗ PDF DRAINAGE LAYOUT PHASE 5 REV D Plans and Drawings · 1 Aug 2025 View ↗ PDF DRAINAGE LAYOUT PHASE 4 REV D Plans and Drawings · 1 Aug 2025 View ↗ PDF HEALTH IMPACT ASSESSMENT PHASES 4-6 Supporting Report · 1 Aug 2025 View ↗ PDF NOISE IMPACT ASSESSMENT Supporting Report · 1 Aug 2025 View ↗ PDF PLANNING STATEMENT PHASES 4-6 Supporting Report · 1 Aug 2025 View ↗ PDF UPDATED PHASE 1 HABITAT SURVEY Supporting Report · 1 Aug 2025 View ↗ PDF DESIGN CODE COMPLIANCE STATEMENT Supporting Report · 1 Aug 2025 View ↗

Plans & drawings 92

PDF HARD LANDSCAPING PLAN Plans and Drawings · 2 Dec 2025 View ↗ PDF 10882.01.408 PHASE 4 PLANTING PLAN (SHEET 8). Plans and Drawings · 2 Dec 2025 View ↗ PDF 10882.01.407 PHASE 4 PLANTING PLAN (SHEET 7 Plans and Drawings · 2 Dec 2025 View ↗ PDF VISIBILITY SPLAYS-PHASE 4. Plans and Drawings · 1 Dec 2025 View ↗ PDF PHASE 6_25.07.25-EXTERNAL WORKS Plans and Drawings · 1 Dec 2025 View ↗ PDF PHASE 5_27.11.25-EXTERNAL WORKS Plans and Drawings · 1 Dec 2025 View ↗ PDF POS - MOSLEY PHASE 4 - 6 Plans and Drawings · 1 Dec 2025 View ↗ PDF MOSLEY COMMON PHASE 4 -6 HOUSETYPE PACK VERSION 3 Plans and Drawings · 1 Dec 2025 View ↗ PDF MOSLEY COMMON - PHASE 4-6 - BOUNDARY TREATMENT PLAN (B) Plans and Drawings · 1 Dec 2025 View ↗ PDF C-700 - REFUSE STRATEGY PLAN (G). Plans and Drawings · 1 Dec 2025 View ↗ PDF C-100-PHASE 4-6 SITE LAYOUT (REV Q Plans and Drawings · 1 Dec 2025 View ↗ PDF HASE 4-6 - BOUNDARY TREATMENT PLAN (I) Plans and Drawings · 1 Dec 2025 View ↗ PDF CYCLE Plans and Drawings · 27 Nov 2025 View ↗ PDF PV PLAN Plans and Drawings · 27 Nov 2025 View ↗ PDF PV PLAN Plans and Drawings · 27 Nov 2025 View ↗ PDF EV PLAN Plans and Drawings · 27 Nov 2025 View ↗ PDF REFUSE STRATEGY Plans and Drawings · 10 Nov 2025 View ↗ PDF S104 Plans and Drawings · 28 Oct 2025 View ↗ PDF VEHICLE TRACKING Plans and Drawings · 28 Oct 2025 View ↗ PDF VEHICLE TRACKING Plans and Drawings · 28 Oct 2025 View ↗ PDF PLAY Plans and Drawings · 28 Oct 2025 View ↗ PDF PLAY Plans and Drawings · 28 Oct 2025 View ↗ PDF HOUSETYPES Plans and Drawings · 28 Oct 2025 View ↗ PDF PUMPING Plans and Drawings · 22 Oct 2025 View ↗ PDF RESPONSE CONSULTEES Plans and Drawings · 22 Oct 2025 View ↗ PDF MATERIALS REV G Plans and Drawings · 22 Oct 2025 View ↗ PDF BOUNDARY TREATMENTS Plans and Drawings · 22 Oct 2025 View ↗ PDF SITE LAYOUT REV P Plans and Drawings · 22 Oct 2025 View ↗ PDF LEAP Plans and Drawings · 22 Oct 2025 View ↗ PDF PHASING REV C Plans and Drawings · 22 Oct 2025 View ↗ IMG NO ACCESS TO WELLINGTON DRIVE PHASE Plans and Drawings · 22 Oct 2025 View ↗ PDF MOSLEY WOODS HOUSETYPE PACK Plans and Drawings · 7 Aug 2025 View ↗ PDF PROW STRATEGY REV B Plans and Drawings · 7 Aug 2025 View ↗ PDF STOREY HEIGHTS PLAN REV E Plans and Drawings · 7 Aug 2025 View ↗ PDF REFUSE STRATEGY PLAN REV E Plans and Drawings · 7 Aug 2025 View ↗ PDF MATERIALS PLAN REV E Plans and Drawings · 7 Aug 2025 View ↗ PDF KELLEN HOMES MOSLEY COMMON MUGA Plans and Drawings · 7 Aug 2025 View ↗ PDF KELLEN HOMES MOSLEY COMMON LEAP Plans and Drawings · 7 Aug 2025 View ↗ PDF BOUNDARY TREATMENT PLAN REV G Plans and Drawings · 7 Aug 2025 View ↗ PDF PHASING PLAN STRATEGY Supporting Report · 7 Aug 2025 View ↗ PDF PHASING PLAN REV B Plans and Drawings · 7 Aug 2025 View ↗ PDF SITE LAYOUT PHASE 4-6 REV K Plans and Drawings · 7 Aug 2025 View ↗ PDF MASTER SITE LAYOUT COLOUR LAYOUT REV J Plans and Drawings · 7 Aug 2025 View ↗ PDF BOUNDARY TREATMENT DETAILS Plans and Drawings · 1 Aug 2025 View ↗ PDF ARTIST IMAGE 2 Plans and Drawings · 1 Aug 2025 View ↗ PDF ARTIST IMAGE 1 Plans and Drawings · 1 Aug 2025 View ↗ PDF CYCLE STORAGE OXFORD TASK FORCE Plans and Drawings · 1 Aug 2025 View ↗ PDF EV CHARGING POINT DATA Plans and Drawings · 1 Aug 2025 View ↗ PDF PROPOSED FINISHED LEVELS PHASE 6 Plans and Drawings · 1 Aug 2025 View ↗ PDF PROPOSED FINISHED LEVELS PHASE 5 Plans and Drawings · 1 Aug 2025 View ↗ PDF PROPOSED FINISHED LEVELS PHASE 4 Plans and Drawings · 1 Aug 2025 View ↗ PDF HARD LANDSCAPING PLAN PHASE 4-6 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING NOTES Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING SCHEDULE Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 11 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 10 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 9 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 8 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 7 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 6 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 5 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 4 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 3 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 2 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 PLANTING PLAN SHEET 1 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 4 LANDSCAPE KEY PLAN Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 5 PLANTING SCHEDULE AND NOTES Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 5 PLANTING PLAN SHEET 2 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 5 PLANTING PLAN SHEET 1 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 5 LANDSCAPE KEY PLAN Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 PLANTING SCHEDULE AND NOTES Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 PLANTING PLAN SHEET 4 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 PLANTING PLAN SHEET 3 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 PLANTING PLAN SHEET 2 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 PLANTING PLAN SHEET 1 Plans and Drawings · 1 Aug 2025 View ↗ PDF SOFT LANDSCAPING PHASE 6 LANDSCAPE KEY PLAN Plans and Drawings · 1 Aug 2025 View ↗ PDF LOCATION PLAN Location Plan · 1 Aug 2025 View ↗ PDF GREEN LINKAGES Plans and Drawings · 1 Aug 2025 View ↗ PDF WATERCOURSE SECTIONS SECTION EE Plans and Drawings · 1 Aug 2025 View ↗ PDF WATERCOURSE SECTIONS SECTION DD Plans and Drawings · 1 Aug 2025 View ↗ PDF WATERCOURSE SECTIONS SECTION CC Plans and Drawings · 1 Aug 2025 View ↗ PDF WATERCOURSE SECTIONS SECTION BB Plans and Drawings · 1 Aug 2025 View ↗ PDF WATERCOURSE SECTIONS SECTION AA Plans and Drawings · 1 Aug 2025 View ↗ PDF RETAINING WALL SECTIONS PHASE 6 Plans and Drawings · 1 Aug 2025 View ↗ PDF RETAINING WALL SECTIONS PHASE 5 Plans and Drawings · 1 Aug 2025 View ↗ PDF RETAINING WALL SECTIONS PHASE 4 Plans and Drawings · 1 Aug 2025 View ↗ PDF TOPOGRAPHICAL EXISTING LEVELS PLAN PHASE 6 Plans and Drawings · 1 Aug 2025 View ↗ PDF TOPOGRAPHICAL EXISTING LEVELS PLAN PHASE 5 Plans and Drawings · 1 Aug 2025 View ↗ PDF TOPOGRAPHICAL EXISTING LEVELS PLAN PHASE 4 Plans and Drawings · 1 Aug 2025 View ↗ PDF VISABILITY SPLAYS PHASE 6 Plans and Drawings · 1 Aug 2025 View ↗ PDF VISABILITY SPLAYS PHASE 5 Plans and Drawings · 1 Aug 2025 View ↗ PDF VISABILITY SPLAYS PHASE 4 Plans and Drawings · 1 Aug 2025 View ↗

Other documents 18

PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 1 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 2 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 3 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 4 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 5 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 6 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 7 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 8 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 9 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 10 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 4 PART 11 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 5 PART 1 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 5 PART 2 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 6 PART 1 Supporting Report · 7 Aug 2025 View ↗ PDF PHASE II GEOENVIRONMENTAL SITE PHASE 6 PART 2 Supporting Report · 7 Aug 2025 View ↗ PDF PRELIMINARY ROOST ASSESSEMT Supporting Report · 1 Aug 2025 View ↗ PDF LAP PLAY AREA INSTALLATION Supporting Report · 1 Aug 2025 View ↗ PDF COVERING LETTER REDACTED Attachment · 1 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 3

Also on the record
Radon affected area, class 3; Coalfield, development low risk area; Inside the Tyldesley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wigan - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wigan
Application type
Major Reserved Matters
Received
7 May 2025
Validated
7 Aug 2025
Ward
Tyldesley And Mosley Common
Parish
Tyldesley And Astley Township
Case officer
Show
Target decision
5 Dec 2025
Decision
Approved with Conditions
Decision date
4 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Turley

How this decision compares

Decided in 119 days from validation, 27 days slower than Wigan's median of 92 for reserved matters. Approved, as 96% of reserved matters here are.

27%decided within 8 weeks
96%approved
12%go to committee

Plota live figures for reserved matters decided across the UK in the last twelve months, from validation; too few recent reserved matters in Wigan to go on. Wigan decision record →

Public comments

No public comments yet.

85 neighbours consulted · Last counted 16 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13990910
Planning Portal ref
PP-13990910
Neighbours
8 Aug 2025
Consultation
28 Oct 2025
Comments by
18 Nov 2025
Site or press notice
8 Aug 2025
Statutory expiry
6 Nov 2025
Env. assessment
No
Wigan
Planning Authority Score
2/10
Poor
#273 of 296 councils
Relevant to this application:
Major dwellings

Wigan is slower than most councils at deciding householder applications, ranking #216 out of 296. The council extends the time limit on 57% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wigan decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #213 of 296
87%
Householder approved
Below avg (90%) #236 of 296
54%
Decided in 8 weeks
Below avg (63%) #216 of 296
57%
Extended time limit
Above avg (41%) #262 of 296
70%
Minor dwellings approved
69 decided (1-9 homes)
94%
Major dwellings approved
16 decided (10+ homes)
60%
Change of use approved
50 decided
708
Total decisions
109 refused in the year to March 2026