Atlas Road Car Park, Atlas Road Park Royal London NW10 6DN Data via plota.co.uk

263908OPDCOB - OPDC Consultation by Other Boroughs Pending Consideration

Proposal

Temporary planning permission for a period of five years, for the proposed use of the site as a construction compound to support the demolition and construction activities arising from the OPEN Energy Centre and district heating network development (granted under permission reference ), comprising the installation of a two-storey modular site office and welfare building, and a single-storey modular education (STEM) unit; provision of storage areas for plant, materials, spoil and aggregates; provision of loading/unloading areas and workforce vehicle parking spaces; and other associated works. (Out of Borough) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
Decision
Expected by 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 18 Dec 2026 and 2 Jan 2027, from Ealing's recent commercial and major works.

Site constraints 6

Public footpath about 10 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Conservation area about 11 m away: Canalside, northeast part
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 26 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
OPDC Consultation by Other Boroughs
Postcode
NW10 6DN
Received
23 Oct 2026
Validated
23 Oct 2026
Target decision
12 Nov 2026

Decision outlook

Day 5 of the 56-day target. Ealing usually decides commercial and major works by day 63.

Day 558 days to the predicted decision (day 63)
45%decided within 8 weeks
90%approved
61decided in the last year

Plota live figures for commercial and major works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Nov 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026