Waitrose & Partners, Westfield London,Ariel Way,Shepherd's Bush,London,W12 7SL Data via plota.co.uk

P/2026/00947/FUL - Full Planning Application Approved

Proposal

Installation of a plant replacement comprising of air conditioning units and DAC plant units at roof level; replacement of 1no double door with new emergency escape swing doors and a sliding lockable glazed delivery hatch at ground floor level to south eastern elevation of the building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Apr 2026
✓
Validated
2 Jun 2026
✓
Approved
28 Jul 2026

Approved on 28 Jul 2026 · Last checked 21 Sept 2026

Documents 29

Plans & drawings 15

PDF Amended proposed site plan Revised · 20 Jul 2026 View ↗ PDF Amended propsoed elevations Revised · 20 Jul 2026 View ↗ PDF Construction Logistics Plan Report · 20 Jul 2026 View ↗ PDF 462_11642-FCA-CR-00-DR-A_P01000-S2-P.01 Location Plan.pdf Drawing · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-00-DR-A_P01001-S2-P.01 Existing Site Plan.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-00-DR-A_P03012-S2-P.01 Existing Ground Floor Plan.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-B1-DR-A_P03013-S2-P.01 Existing Basement Plan.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-B1-DR-A_P03113-S2-P.01 Proposed Basement Plan.pdf Proposed Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-R1-DR-A_P20010-S2-P.01 Existing Roof Plan.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-ZZ-DR-A-P21030-S2-P01 Existing External Elevations.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF Elevation (Rear) - Existing_included_in_Elevation (Front) - Existing.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF Elevation (Side) - Existing_included_in_Elevation (Front) - Existing.pdf Existing Drawings · 8 Apr 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Elevation (Front) - Proposed.pdf Proposed Drawings · 8 Apr 2026 View ↗ PDF Elevation (Side) - Proposed_included_in_Elevation (Front) - Proposed.pdf Proposed Drawings · 8 Apr 2026 View ↗ PDF 462_11642-FCA-CR-R1-DR-A_P21011-S2-P.01 Proposed Roof Plan.pdf Proposed Drawings · 8 Apr 2026 View ↗

All documents on the council site ↗

Site constraints 7

Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shepherds Bush Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1374 m away: Thames Tideway Tunnel; 1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W12 7SL
Received
8 Apr 2026
Validated
2 Jun 2026
Ward
Shepherd's Bush Green
Case officer
Show
Decision
Application Approved
Decision date
28 Jul 2026
Applicant
Show

How this decision compares

Decided in 56 days from validation, 19 days faster than Hammersmith and Fulham's median of 75 for utility and infrastructure works. Approved, as 98% of utility and infrastructure works here are.

28%decided within 8 weeks
98%approved
43decided in the last year

Plota live figures for utility and infrastructure works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
6 Jun 2026
Comments by
4 Jul 2026
Statutory expiry
28 Jul 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026