Chelsea Harbour Design Centre Harbour Avenue, Chelsea Harbour, London,SW10 0XE Data via plota.co.uk

P/2026/02207/NMAT - Non-Material Amendment Submission Approved

Proposal

Non-material amendment to planning permission ref: granted 10th April 2012 for the 'Variation of Conditions: 2 (approved drawings); 5 (landscaping); 7 (acoustic screening) and 12 (construction and green roof) of Planning Permission , granted 2nd June 2010.' Amendments sought to include: omission of the showroom units proposed in the space known as 'the Avenue', which is currently used as circulation space comprising of the following - Proposed Ground Floor - Omission of Unit G33, Unit G34, Unit G35, Unit G36, Unit G37; Proposed First Floor - Omission of Unit 133, Unit 134, Unit 135A, Unit 135B, Unit 136, Unit 137, Unit 138, Unit 139 and Unit 140; Proposed Second Floor - Omission of Unit 236, Unit 238, Unit 239, Unit 240, Unit 241, Unit 242, Unit 243, Unit 244; Proposed Third Floor - Omission of Unit 332, Unit 333, Unit 334, Unit 335, Unit 336 and Unit 337. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Aug 2026
✓
Validated
26 Aug 2026
✓
Approved
28 Sept 2026

Approved on 28 Sept 2026 · Last checked 29 Sept 2026

Site constraints 6

National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Conservation area 81 m away: Sands End; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 40 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,432 m² (15,414 sq ft)
Energy ratingB (asset rating 30)
UseA1/A2 Retail and Financial/Professional services
HeatingAir Conditioning

From the energy performance certificate lodged in April 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
SW10 0XE
Received
25 Aug 2026
Validated
26 Aug 2026
Ward
Sands End
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
28 Sept 2026
Applicant
Show
Leaseholder
Show

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
26 Aug 2026
Statutory expiry
23 Sept 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.