Land 70 Metres North Of 9 Ashgrove Cottage Ashgrove Road Rattray Blairgowrie PH10 7EX Data via plota.co.uk

26/00557/FLL - planning permission local Approved

Proposal

Installation of sewage treatment plant, pipework and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Apr 2026
✓
Validated
12 May 2026
✓
Approved
22 Jul 2026

Approved on 22 Jul 2026 · Delegated Decision · Last checked 7 Sept 2026

Site constraints 2

Special area of conservation about 212 m away: River Tay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
1 listed building within 150 m of the postcode pin.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
planning permission local
Postcode
PH10 7EX
Received
24 Apr 2026
Validated
12 May 2026
Ward
Blairgowrie And Glens
Parish
Blairgowrie And Rattray
Case officer
Show
Decision
Approve the application
Decision date
22 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 71 days from validation, 19 days slower than Perth's median of 52 for utility and infrastructure works. Approved, as 92% of utility and infrastructure works here are.

61%decided within 8 weeks
92%approved
9%go to committee

Plota live figures for utility and infrastructure works decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Comments by
12 Jun 2026
Env. assessment
No