PA/26/01430/NC - Observations to Other Authorities Decided

Proposal

Observation requested by London borough of Hackney, Request for a Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment Regulations 2017) relating to a proposal for the demolition of the existing Bavaria House (including existing basement) and the construction of a hotel tower to provide the following: ? Hotel (Use Class C1); ? Total floorspace of approximately 34,295m2 (Gross Internal Area (GIA)); ? Extensive public realm enhancements including hard and soft landscaping; and ? Proposed basement extension. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
Decision
Target date was 4 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 11 Nov 2026, from Tower Hamlets's recent commercial and major works.

Site constraints 15

3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shoreditch
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Conservation area 22 m away: Sun Street
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National infrastructure project 1230 m away: Thames Tideway Tunnel; Heritage at risk 21 m away: Sun Street, City of London; Wider setting of protected view 8A.1 Westminster Pier to St Paul's Cathedral; 2 listed buildings within 150 m; Scheduled monument 249 m away: Priory and Hospital of St Mary Spital; Inside the Hackney built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 34 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Observations to Other Authorities
Postcode
EC2A 2NB
Received
12 Aug 2026
Validated
12 Aug 2026
Case officer
Show
Target decision
4 Sept 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 77, past the statutory target. 67% of commercial and major works in Tower Hamlets are decided within thirteen weeks, which runs to 11 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 7721 days past the 56-day target
37%decided within 8 weeks
85%approved
33decided in the last year

Plota live figures for commercial and major works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Statutory expiry
4 Sept 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026