Morrisons, Weymouth Street, Warminster , BA12 9NT Data via plota.co.uk
Proposal
Creation of charging zone, erection of EV chargers, jet wash bays, sub-station enclosure, LV panel, meter cabinet, plant room and associated works. Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 64.
Documents 18
Statements & assessments 3
Plans & drawings 11
Application forms 1
Consultation & comments 2
Other documents 1
Site constraints 3
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in May 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate
Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Nearby new applications
9 THE MALTINGS, WARMINSTER, BA12 8JR
TG1- 3 Poplar remove to ground level. TG2 - 2 Ash remove to ground level. T1 -...
22 Market Place, Warminster, Wiltshire, BA12 9AN
Removal of existing staircase to replace with purpose made staircase and handrai...
42 PORTWAY, WARMINSTER, BA12 8QD
T1 Oak - Reduce overhang lateral branches by 2m to leave a branch length of 4m a...
WREN HOUSE, 32 VICARAGE STREET, WARMINSTER, BA12 8JF
T1 Beech tree - Reduce crown by 3 metres on all aspects. Lift crown to a height ...
23 VICARAGE STREET, WARMINSTER, BA12 8JG
Discharge of Condition 2 (New Window Detail) of PL/2026/03755
St Lawrence Chapel, High Street, Warminster
General repairs and improvements to the fabric of the Chapel of St Lawrence
Important details
Decision outlook
Day 64, past the statutory target. 85% of utility and infrastructure works in Wiltshire are decided within thirteen weeks, which runs to 24 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 26 Oct 2026.
Plota live figures for utility and infrastructure works decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →
Public comments
20% object · below the UK average of 74%
Last counted 26 Oct 2026
Consultation & key dates
- Comments by
- 25 Sept 2026
Historical activity at this location
12 nearby applications on record - archival context, not part of the live application.
Nearby activity
Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
Morrisons, Weymouth Street, Warminster , BA12 9NT
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 25 Sept 2026.