St Pauls Church Gulworthy PL19 8JA Data via plota.co.uk

2315/26/FUL - Full Planning Application Within Consultation Period

Proposal

External alterations to the church including insertion of slate louvred vent, new drains around the church and trench arch system. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
Validated
15 Oct 2026
Decision
Expected by 10 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Dec 2026, from West Devon's recent listed building works.

Comments are open until 19 Nov 2026

Comment on this application ↗

Site constraints 6

Tamar Valley National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
1 listed building within 150 m of the postcode pin
Nearest: Church of St Paul, Grade II, about 55 m from the postcode pin
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Priority habitat about 20 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 16 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
West Devon
Application type
Full Planning Application
Postcode
PL19 8JA
Received
17 Aug 2026
Validated
15 Oct 2026
Ward
Bere Ferrers
Parish
Gulworthy
Case officer
Show
Applicant
Show
Agent
O'Brien Van der Steen Workshops

Decision outlook

Day 14 of the 56-day target. West Devon usually decides listed building works by day 55.

Day 1442 days to the 56-day target
63%decided within 8 weeks
98%approved
41decided in the last year

Plota live figures for listed building works decided by West Devon in the last twelve months, from validation. West Devon decision record →

Consultation & key dates

Consultation
15 Oct 2026
Comments by
19 Nov 2026