Car Park Adjacent 1 To 11 Cumberland Street Luton Data via plota.co.uk

26/00878/EIASCR - Screening Opinion Decided

Proposal

Request for Screening Opinion pursuant to Regulation 6 of The Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) - The Proposed Development will provide up to 250 residential units with 1090m2 of (internal and external) amenity space together with associated car parking and cycle storage. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Aug 2026
✓
EIA Not Required
7 Sept 2026

EIA Not Required on 7 Sept 2026 · Delegated Decision · Last checked 10 Sept 2026

Documents 15

All documents on the council site ↗

Site constraints 4

National infrastructure project 242 m away: London Luton Airport Expansion
The site is 242 m from the project boundary. Airport, decided. The project page says whether consent was granted. Also within 2 km: M1 Junction 10a Grade Separation - Luton (decided, 1419 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Luton built-up area; Air quality management area 82 m away: Luton AQMA No.3.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Luton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Luton
Application type
Screening Opinion
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
CENTRAL
Case officer
Show
Target decision
7 Sept 2026
Decision
EIA Not Required
Decision date
7 Sept 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Luton
Planning Authority Score
3.2/10
Poor
#229 of 296 councils
Relevant to this application:
Householder decisions

Luton ranks #187 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Luton decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #281 of 296
86%
Householder approved
Below avg (90%) #245 of 296
60%
Decided in 8 weeks
Below avg (63%) #187 of 296
43%
Extended time limit
Above avg (41%) #171 of 296
35%
Minor dwellings approved
71 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
40%
Change of use approved
53 decided
741
Total decisions
179 refused in the year to March 2026