Rear Of Eastfield House Main Street Corbridge Northumberland NE45 5LA Data via plota.co.uk

26/01349/LBC - Listed Building Consent Approved

Proposal

Listed Building Consent for structural repairs, underpinning and remedial works to garage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Apr 2026
✓
Validated
30 Apr 2026
✓
Consultation
8 Jun 2026
✓
Approved
8 Jun 2026

Approved on 8 Jun 2026 · Delegated Decision · Last checked 1 Aug 2026

Site constraints 8

Corbridge conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
16 listed buildings within 150 m
Nearest: Premises Occupied by Smiths Gore and Christies Limited, Grade II, 15 m away · 1 Grade I, 15 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 16 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Scheduled monument 175 m away: Corbridge Bridge; Radon affected area, class 2; Coalfield, development low risk area; Inside the Corbridge built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (County) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
NE45 5LA
Received
15 Apr 2026
Validated
30 Apr 2026
Ward
Corbridge
Parish
Corbridge
Case officer
Show
Target decision
28 May 2026
Decision
Application Permitted
Decision date
8 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Milburn Planning Ltd

How this decision compares

Decided in 39 days from validation, 17 days faster than Northumberland (County)'s median of 56 for listed building works. Approved, as 92% of listed building works here are.

62%decided within 8 weeks
92%approved
226decided in the last year

Plota live figures for listed building works decided by Northumberland (County) in the last twelve months, from validation. Northumberland (County) decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 1 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14854731
Planning Portal ref
PP-14854731
Neighbours
1 May 2026
Consultation
8 Jun 2026
Comments by
8 Jun 2026
Site or press notice
12 May 2026
Statutory expiry
28 May 2026
Env. assessment
No
Northumberland (County)
Planning Authority Score
3.8/10
Below average
#207 of 296 councils
Relevant to this application:
Other decisions

Northumberland (County) ranks #167 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (County) decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #158 of 296
91%
Householder approved
Above avg (90%) #178 of 296
62%
Decided in 8 weeks
Below avg (63%) #167 of 296
47%
Extended time limit
Above avg (41%) #210 of 296
80%
Minor dwellings approved
223 decided (1-9 homes)
89%
Major dwellings approved
36 decided (10+ homes)
86%
Change of use approved
71 decided
2,013
Total decisions
233 refused in the year to March 2026