Builders Yard 239 Horn Lane Acton W3 9ED Data via plota.co.uk

262829CND - Discharge Condition Approved

Proposal

Details of the site movement hours pursuant to condition 7 of the Transport and Works Act Order for the temporary planning permission to use the site as a construction compound until the end of 2029 to provide a level access for Network Rail contractors onto the Great Western Mainline (reference dated 18.05.2026) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2026
✓
Approved
7 Aug 2026

Approved on 7 Aug 2026 · Delegated Decision · Last checked 7 Aug 2026

Site constraints 5

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1253 m away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 15 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,595 m² (27,932 sq ft)
Energy ratingC (asset rating 59)
UseB8 Storage or Distribution
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in May 2012, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Discharge Condition
Postcode
W3 9ED
Received
17 Jun 2026
Validated
17 Jun 2026
Ward
North Acton
Case officer
Show
Target decision
12 Aug 2026
Decision
Approved
Decision date
7 Aug 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 7 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15014623
Planning Portal ref
PP-15014623
Statutory expiry
12 Aug 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.