Flat 1, 25 Cliveden Place, London, SW1W 8HD Data via plota.co.uk

LB/26/04975 - Listed Building Consent Consultation

Proposal

Internal alterations comprising creation of opening in spine wall between reception room and kitchen, refurbishment of half landing bathroom including replacement of door, changes to doors into front bedroom and bathroom, alterations to layout of third-floor bathroom and removal of carpets and installation of new hardwood flooring throughout. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Dec 2026 and 5 Feb 2027, from Kensington and Chelsea's recent extensions.

Comments are open until 20 Nov 2026

Comment on this application ↗

Site constraints 12

36 listed buildings within 150 m of the postcode pin
Nearest: 19-25, Cliveden Place Sw1, Grade II, the postcode pin is inside its outline · 1 Grade I, 3 Grade II*, 32 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 36 with distances
Historic England ↗
Sloane Square conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Protected view corridor: 9A.1 King Henry's Mound to St Paul's Cathedral
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 385 m away: Thames Tideway Tunnel
The site is about 385 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 24 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Registered park or garden about 133 m away: The Grosvenor Estate: Eaton Square; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre about 72 m away: King's Road (east).
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 28 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
SW1W 8HD
Received
15 Sept 2026
Validated
23 Oct 2026
Ward
Royal Hospital
Target decision
18 Dec 2026
Applicant
Show

Decision outlook

Day 6 of the 56-day target. Kensington and Chelsea usually decides extensions by day 83.

Day 677 days to the predicted decision (day 83)
33%decided within 8 weeks
95%approved
1,441decided in the last year

Plota live figures for extensions decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Consultation & key dates

Comments by
20 Nov 2026
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 councils
Relevant to this application:
Other decisions

Kensington and Chelsea ranks #174 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025