328 - 330 Portswood Road Southampton SO17 2TD Data via plota.co.uk

26/01152/FUL - Full Application Awaiting decision

Proposal

Installation of cooking extraction system (retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 Oct 2026
✓
Consultation
19 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Dec 2026 and 8 Dec 2026, from Southampton's recent utility and infrastructure works.

Comments are open until 9 Nov 2026

Comment on this application ↗

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Article 4 direction
HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
1 listed building within 150 m
Nearest: 324, Portswood Road, Grade II, 18 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 259 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Radon affected area, class 3; Inside the Southampton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 20 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southampton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SO17 2TD
Received
around 6 Oct 2026
Validated
6 Oct 2026
Ward
Swaythling
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show

Decision outlook

Day 22 of the 56-day target. Southampton usually decides utility and infrastructure works by day 61.

Day 2239 days to the predicted decision (day 61)
46%decided within 8 weeks
100%approved
26decided in the last year

Plota live figures for utility and infrastructure works decided by Southampton in the last twelve months, from validation. Southampton decision record →

Public comments

1comment received
1 objecting

23 neighbours consulted · Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
12796
Neighbours
19 Oct 2026
Consultation
19 Oct 2026
Comments by
9 Nov 2026
Statutory expiry
1 Dec 2026
Env. assessment
No
Southampton
Planning Authority Score
5/10
Average
#150 of 296 councils
Relevant to this application:
Householder decisions

Southampton ranks #158 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Southampton decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #117 of 296
93%
Householder approved
Above avg (90%) #137 of 296
63%
Decided in 8 weeks
Above avg (63%) #158 of 296
40%
Extended time limit
Below avg (41%) #154 of 296
70%
Minor dwellings approved
50 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
86%
Change of use approved
109 decided
742
Total decisions
72 refused in the year to March 2026