Chapel Royal Masonic School Rickmansworth Park Rickmansworth Hertfordshire Data via plota.co.uk

25/1090/LBC - Listed Building Consent Approved

Proposal

Listed Building Consent: Repairs to the ceiling, roof and gutters of the Grade II listed Chapel; widening gutters; installation of hoppers and downpipes; replacement lead flashing; external CAT ladder; internal alterations; updating internal services including heating Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Jun 2025
✓
Validated
3 Jul 2025
✓
Consultation
15 Jul 2025
✓
Approved
7 Nov 2025

Approved on 7 Nov 2025 · Delegated Decision · Last checked 15 Oct 2026

Documents 113

Plans & drawings 104

PDF 242756-PUR-01-ZZ-DR-A-2200 PROPOSED SECTIONAL ELEVATION 1A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2201 PROPOSED SECTIONAL ELEVATION 1B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2202 PROPOSED SECTIONAL ELEVATION 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2203 PROPOSED SECTIONAL ELEVATION 3A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2204 PROPOSED SECTIONAL ELEVATION 3B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2205 PROPOSED SECTIONAL ELEVATION 4 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2206 PROPOSED SECTIONAL ELEVATION 5A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2207 PROPOSED SECTIONAL ELEVATION 5B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2208 PROPOSED SECTIONAL ELEVATION 6 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1200 EXISTING SECTIONAL ELEVATION 1A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1201 EXISTING SECTIONAL ELEVATION 1B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1202 EXISTING SECTIONAL ELEVATION 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1203 EXISTING SECTIONAL ELEVATION 3A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1204 EXISTING SECTIONAL ELEVATION 3B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1205 EXISTING SECTIONAL ELEVATION 4 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1206 EXISTING SECTIONAL ELEVATION 5A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1207 EXISTING SECTIONAL ELEVATION 5B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1208 EXISTING SECTIONAL ELEVATION 6 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1570 DEMOLITION SECTIONAL ELEVATION 1A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1571 DEMOLITION SECTIONAL ELEVATION 1B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1572 DEMOLITION SECTIONAL ELEVATION 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1573 DEMOLITION SECTIONAL ELEVATION 3A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1574 DEMOLITION SECTIONAL ELEVATION 3B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1575 DEMOLITION SECTIONAL ELEVATION 4 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1576 DEMOLITION SECTIONAL ELEVATION 5A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1577 DEMOLITION SECTIONAL ELEVATION 5B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1578 DEMOLITION SECTIONAL ELEVATION 6 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1001 EXISTING GROUND FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1002 EXISTING GROUND FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1003 EXISTING BASEMENT FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1004 EXISTING BASEMENT FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1005 EXISTING RCP A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1006 EXISTING RCP B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1007 EXISTING ROOF PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1008 EXISTING ROOF PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1501 DEMOLITION GROUND FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1502 DEMOLITION GROUND FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1503 DEMOLITION BASEMENT FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1504 DEMOLITION BASEMENT FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1505 DEMOLITION RCP A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1506 DEMOLITION RCP B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1507 DEMOLITION ROOF PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-1508 DEMOLITION ROOF PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2001 PROPOSED GROUND FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2002 PROPOSED GROUND FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2003 PROPOSED BASEMENT FLOOR PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2004 PROPOSED BASEMENT FLOOR PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2005 PROPOSED RCP A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2006 PROPOSED RCP B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2007 PROPOSED ROOF PLAN A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-00-DR-A-2008 PROPOSED ROOF PLAN B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2100 PROPOSED SOUTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2101 PROPOSED SOUTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2102 PROPOSED WEST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2103 PROPOSED NORTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2104 PROPOSED NORTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-2105 PROPOSED EAST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1100 EXISTING SOUTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1101 EXISTING SOUTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1102 EXISTING WEST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1103 EXISTING NORTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1104 EXISTING NORTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1105 EXISTING EAST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1550 DEMOLITION SOUTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1551 DEMOLITION SOUTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1552 DEMOLITION WEST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1553 DEMOLITION NORTH ELEVATION A Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1554 DEMOLITION NORTH ELEVATION B Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1555 DEMOLITION EAST ELEVATION Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3000 PROPOSED HL GUTTER SECTION 1 (THROUGH GUTTER HIGH POINT) Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3001 PROPOSED HL GUTTER SECTION 2 (THROUGH CATCH PIT) Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3002 PROPOSED SECTION THROUGH END WALL PARAPET Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3003 PROPOSED SECTION THROUGH TG 1 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3004 PROPOSED SECTION THROUGH TG 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3005 PROPOSED SECTION THROUGH TG 3 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3006 PROPOSED SECTION THROUGH TG 4 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3007 PROPOSED SECTION THROUGH ROOF HIP 1 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3008 PROPOSED SECTION THROUGH ROOF HIP 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3009 PROPOSED CAT LADDERS Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3010 PROPOSED LONG SECTION THROUGH NAVE GUTTER 1 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3011 PROPOSED LONG SECTION THROUGH NAVE GUTTER 2 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3012 PROPOSED LONG SECTION THROUGH NAVE GUTTER 3 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3013 PROPOSED LONG SECTION THROUGH NAVE GUTTER 4 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3014 PROPOSED LONG SECTION THROUGH NAVE GUTTER 5 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3015 PROPOSED LONG SECTION THROUGH NAVE GUTTER 6 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3016 PROPOSED LONG SECTION THROUGH NAVE GUTTER 7 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3017 PROPOSED LONG SECTION THROUGH NAVE GUTTER 8 - NORTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3018 PROPOSED FAN CONVECTOR UNIT COVER - PLAN Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3019 PROPOSED FAN CONVECTOR UNIT COVER 2 Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3020 PROPOSED LONG SECTION THROUGH NAVE GUTTER 1 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3021 PROPOSED LONG SECTION THROUGH NAVE GUTTER 2 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3022 PROPOSED LONG SECTION THROUGH NAVE GUTTER 3 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3023 PROPOSED LONG SECTION THROUGH NAVE GUTTER 4 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3024# PROPOSED LONG SECTION THROUGH NAVE GUTTER 5 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3025 PROPOSED LONG SECTION THROUGH NAVE GUTTER 6 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3026 PROPOSED LONG SECTION THROUGH NAVE GUTTER 7 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3027 PROPOSED LONG SECTION THROUGH NAVE GUTTER 8 - SOUTH SIDE Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-ZZ-XX-DR-A-3028 PROPOSED SECTION THROUGH PARAPET TO BITUMEN ROOF - SECTION SHOWN INDICATIVELY Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-00-00-DR-A-0050 LOCATION PLAN OS Extract · 26 Jun 2025 View ↗ PDF 242756-PUR-00-00-DR-A-0060 BLOCK PLAN Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1520 DEMOLITION GROUND FLOOR PLAN A - OPENING UP WORKS Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1521 DEMOLITION GROUND FLOOR PLAN B - OPENING UP WORKS Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1522 DEMOLITION ROOF PLAN A - OPENING UP WORKS Drawing · 26 Jun 2025 View ↗ PDF 242756-PUR-01-ZZ-DR-A-1523 DEMOLITION ROOF PLAN B - OPENING UP WORKS Drawing · 26 Jun 2025 View ↗

All documents on the council site ↗

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Local nature reserve about 214 m away: Rickmansworth Aquadrome
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; 2 listed buildings within 150 m of the postcode pin; National infrastructure project about 397 m away: Expansion of Heathrow Airport (Third Runway), at pre-application; Flood defence about 32 m from the postcode pin (natural high ground, designed for a 1 in 100 year flood); Inside the Rickmansworth built-up area; Green belt about 83 m away: London.
Not affected
No scheduled monument at the site

Checked on 19 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Three Rivers - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Received
26 Jun 2025
Validated
3 Jul 2025
Ward
Rickmansworth Town
Parish
Batchworth Community Council
Case officer
Show
Target decision
7 Nov 2025
Decision
approved
Decision date
7 Nov 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 127 days from validation, 71 days slower than Three Rivers's median of 56 for listed building works. Approved, as 80% of listed building works here are.

56%decided within 8 weeks
80%approved
12%go to committee

Plota live figures for listed building works decided by Three Rivers in the last twelve months, from validation. Three Rivers decision record →

Public comments

No public comments yet.

Last counted 15 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14079269
Planning Portal ref
PP-14079269
Comments by
30 Oct 2025
Site or press notice
15 Jul 2025
Statutory expiry
28 Aug 2025
Env. assessment
No
Three Rivers
Planning Authority Score
7.3/10
Good
#54 of 296 councils
Relevant to this application:
Other decisions

Three Rivers is faster than most councils at deciding householder applications, ranking #30 out of 296. Only 24% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Three Rivers decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #145 of 296
91%
Householder approved
Above avg (90%) #184 of 296
82%
Decided in 8 weeks
Above avg (63%) #30 of 296
24%
Extended time limit
Below avg (41%) #28 of 296
85%
Minor dwellings approved
62 decided (1-9 homes)
63%
Major dwellings approved
8 decided (10+ homes)
94%
Change of use approved
17 decided
819
Total decisions
86 refused in the year to March 2026