76 London Road, Sandy, SG19 1DZ Data via plota.co.uk

Proposal

Erection of a timber framed classroom building, new pathway and gate to an existing wall with the removal of a Western Red Cedar tree Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 May 2026
✓
Validated
11 Jun 2026
✓
Approved
9 Oct 2026

Approved on 9 Oct 2026 · Last checked 13 Oct 2026

Site constraints 3

Also on the record
4 listed buildings within 150 m of the postcode pin; Inside the Sandy built-up area; Air quality management area about 90 m away: Air Quality Management Area No 4 Sandy.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £399,995 in February 2013. Detached house, leasehold.

18 February 2013£399,995
13 June 1995£115,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area38 m² (409 sq ft)
Energy ratingC (asset rating 58)
UseD1 Non-residential Institutions - Education
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in May 2022, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SG19 1DZ
Received
29 May 2026
Validated
11 Jun 2026
Parish
Sandy
Case officer
Show
Target decision
6 Aug 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) Central Bedfordshire Access Group (www.centralbedsaccessgroup.co.uk)The applicants attention is drawn to their responsibility under The Equality Act 2010 and with particular regard to access arrangements for the disabled. The Equality Act 2010 requires that service providers must think ahead and make reasonable adjustments to address barriers that impede disabled people. These requirements are as follows: Where a provision, criterion or practice puts disabled people at a substantial disadvantage to take reasonable steps to avoid that disadvantage; Where a physical feature puts disabled people at a substantial disadvantage to avoid that disadvantage or adopt a reasonable alternative method of providing the service or exercising the function; Where not providing an auxiliary aid puts disabled people at a substantial disadvantage to provide that auxiliary aid. In doing this, it is a good idea to consider the range of disabilities that your actual or potential service users might have. You should not wait until a disabled person experiences difficulties using a service, as this may make it too late to make the necessary adjustment. For further information on disability access contact: The Centre for Accessible Environments (www.cae.org.uk) Central Bedfordshire Access Group (www.centralbedsaccessgroup.co.uk) 2 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority. 3 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 4 )Highway Informatives: The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved. The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.Highway Informatives: The applicant is advised that parking for contractor's vehicles and the storage of materials associated with this development should take place within the site and not extend into within the public highway without authorisation from the highway authority. If necessary the applicant is advised to contact The Street Works Co-ordinator, Central Bedfordshire Highways, by contacting the Highways Helpdesk 0300 300 8301. Under the provisions of the Highways Act 1980 the developer may be liable for any damage caused to the public highway as a result of demolition/construction of the development hereby approved. The contractor and / or client are to ensure that any mud or building material debris such as sand, cement or concrete that is left on the public highway, or any mud arising from construction/demolition vehicular movement, shall be removed immediately and in the case of concrete, cement, mud or mortar not allowed to dry on the highway.
Decision date
9 Oct 2026
Leaseholder
Show

How this decision compares

Decided in 120 days from validation, 55 days slower than Central Bedfordshire's median of 65 for commercial and major works. Approved, as 77% of commercial and major works here are.

42%decided within 8 weeks
77%approved
46decided in the last year

Plota live figures for commercial and major works decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

2comments received
1 objecting1 neutral

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
11 Jun 2026
Comments by
9 Oct 2026
Site or press notice
10 Jul 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.