North Quay and land off Acle New Road Great Yarmouth NR30 1JQ Data via plota.co.uk

Proposal

Hybrid planning application for the phased mixed-use redevelopment of North Quay and land off Acle New Road comprising - Full application: the demolition of existing buildings and provision of an Outlet & Leisure Village comprising retail (Use Class E(a)), food and beverage (Use Classes E(b)/sui generis), and leisure/cinema uses (Use Class E(d)/sui generis), retail storage (Use Class B8), a service yard, management suite and associated facilities (including commerial kiosks (Class E(a)/E(b)/sui generis)); the provision of multi-storey car park and a separate electric vehicle charging hub (accessed from Acle New Road); riverside walkway and other public realm/highways works, landscaping and associated ancillary development; and the change of use of 80, 81 and 82 North Quay from residential (Use Class C3) to flexible uses within Use Classes F1, F2(b) and/or Class E. Outline application (all matters reserved): the provision of a hotel (Use Class C1) and residential development (Use Class C3). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2026
✓
Validated
11 Aug 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from Great Yarmouth's recent commercial premises.

The consultation period closed on 11 Sept 2026.

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Direction - Houses in Multiple Occupation Great Yarmouth. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Special protection area about 75 m away: Outer Thames Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project about 254 m away: Great Yarmouth Third River Crossing
The site is about 254 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: Redmere Wind Farm (at pre-application, about 561 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
5 listed buildings within 150 m of the postcode pin
Nearest: 80, North Quay, Grade II, about 14 m from the postcode pin · 5 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 5 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area about 8 m away: No.2 Market Place, Rows & North Quay Extension
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
National park about 78 m away: The Broads
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
Heritage at risk about 9 m away: Market Place, Rows and North Quay; SSSI about 443 m away: Breydon Water SSSI; Inside the Great Yarmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Great Yarmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
NR30 1JQ
Received
5 Aug 2026
Validated
11 Aug 2026
Parish
GY Central/Northgate
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show

Decision outlook

Day 59 of the 56-day target. Great Yarmouth usually decides commercial premises by day 59.

Day 593 days past the 56-day target
44%decided within 8 weeks
82%approved
57decided in the last year

Plota live figures for commercial premises decided by Great Yarmouth in the last twelve months, from validation. Great Yarmouth decision record →

Consultation & key dates

Consultation
13 Aug 2026
Comments by
11 Sept 2026
Great Yarmouth
Planning Authority Score
4.4/10
Below average
#181 of 296 councils
Relevant to this application:
Change of use

Great Yarmouth ranks #125 out of 296 councils for householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Great Yarmouth decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #171 of 296
92%
Householder approved
Above avg (90%) #154 of 296
69%
Decided in 8 weeks
Above avg (63%) #125 of 296
49%
Extended time limit
Above avg (41%) #221 of 296
69%
Minor dwellings approved
51 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
89%
Change of use approved
18 decided
366
Total decisions
47 refused in the year to March 2026