Queen Alexandra Hospital Southwick Hill Road Portsmouth PO6 3LY Data via plota.co.uk

25/01041/DOC - Discharge of Condition Awaiting decision

Proposal

Application to discharge condition 4 (Contaminated Land) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2025
✓
Consultation
9 Sept 2025
Decision
Target date was 29 Oct 2025

Under consideration

No decision has been issued yet. A decision is expected by 29 Oct 2025.

The consultation period closed on 1 Oct 2025.

Documents 28

Plans & drawings 26

PDF PHASE_1_GEOENVIRONMENTAL_DESK_STUDY__OCTOBER_2020__PART1-2370528 Drawing · 3 Sept 2025 View ↗ PDF PHASE_1_GEOENVIRONMENTAL_DESK_STUDY__OCTOBER_2020__PART2-2370527 Drawing · 3 Sept 2025 View ↗ PDF PHASE_1_GEOENVIRONMENTAL_DESK_STUDY__OCTOBER_2020__PART3-2370526 Drawing · 3 Sept 2025 View ↗ PDF PHASE_1_GEOENVIRONMENTAL_DESK_STUDY__OCTOBER_2020__PART4-2370525 Drawing · 3 Sept 2025 View ↗ PDF PHASE_1_GEOENVIRONMENTAL_DESK_STUDY__OCTOBER_2020__PART5-2370524 Drawing · 3 Sept 2025 View ↗ PDF RUK2021N00070-RAM-RP-00021_REV_01 Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗ PDF GEOENVIROMNENTAL DESK STUDY (REF. 1620009092-RAM-XX-XX-RP-YE-00001-01)_COMPRESSE Drawing · 3 Sept 2025 View ↗

All documents on the council site ↗

Associated applications 3

  • Part of

    OutlineApprovedcouncil archive

    Conditions 8 discharged · 4 awaiting decision

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project 635 m away: Hampshire Water Transfer and Water Recycling Project
The site is 635 m from the project boundary. Dam or reservoir, accepted for examination. Also within 2 km: AQUIND Interconnector (awaiting the Secretary of State's decision, 1144 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
SSSI 227 m away: Portsdown SSSI; Radon affected area, class 2; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 12 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area6,273 m² (67,522 sq ft)
Energy ratingA (asset rating 21)
UseResidential Institutions: Hospitals and Care Homes
HeatingAir Conditioning

From the energy performance certificate lodged in May 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Discharge of Condition
Postcode
PO6 3LY
Received
3 Sept 2025
Validated
3 Sept 2025
Ward
Cosham
Case officer
Show
Target decision
29 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
Turley

Public comments

No public comments yet.

Last counted 20 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14276706
Planning Portal ref
PP-14276706
Consultation
9 Sept 2025
Comments by
1 Oct 2025
Statutory expiry
29 Oct 2025
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.