Skipsea Sands Holiday Park Mill Lane Skipsea East Riding Of Yorkshire YO25 8TZ Data via plota.co.uk

26/01677/PLF - Full Planning Permission Pending Consideration

Proposal

Alterations and extensions to existing holiday park facilities comprising: creation of internal road link, footpath and alterations to car park layout following removal of 1 existing caravan pitch, erection of pergola terrace and bin store, erection of extension to form entrance lobby, installation of facade cladding and associated internal reconfiguration to main building complex following removal of existing pergola; siting of fish and chip container, relocation of existing scoops container, creation of associated service area and delivery drop-off point, installation of a twin canopy and a canopy with transparent panel to form covered seating areas, siting of a stage, construction of fenced children's play area, pedal kart store, multi-use games area (MUGA) with enclosure, 4x4 kart track, kart store building with perimeter fencing; installation of entrance door and ramp to existing arcade building to serve new escape room, internal reconfiguration with associated new fencing and landscaping works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jun 2026
✓
Validated
14 Aug 2026
Decision
Expected by 13 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 29 Oct 2026; it is now day 75.

Comments are open until 29 Oct 2026

Comment on this application ↗

Documents 20

All documents on the council site ↗

Site constraints 6

Easington to Bridlington North Sands 11 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
National infrastructure project 159 m away: Dogger Bank South Offshore Wind Farms
The site is 159 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Dogger Bank Creyke Beck (decided, 1535 m); Dogger Bank D Wind Farm (at pre-application, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Special protection area 173 m away: Greater Wash
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Skipsea built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area154 m² (1,658 sq ft)
Energy ratingE (50 out of 100), could reach C
PropertyDetached house, 6 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
YO25 8TZ
Received
30 Jun 2026
Validated
14 Aug 2026
Ward
East Wolds And Coastal
Parish
Skipsea Parish Council
Case officer
Show
Target decision
13 Nov 2026
Applicant
Show
Agent
NBDA Ltd

Decision outlook

Day 75, past the statutory target. 92% of commercial and major works in East Riding are decided within thirteen weeks, which runs to 13 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Oct 2026.

Day 752 days to the predicted decision (day 77)
80%decided within 8 weeks
90%approved
124decided in the last year

Plota live figures for commercial and major works decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

2comments received
1 objecting1 neutral

Last counted 21 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15049240
Planning Portal ref
PP-15049240
Comments by
29 Oct 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.