Plot Adjacent The Barn Cedar Park Humberston Road Tetney Lincolnshire DN36 5NG Data via plota.co.uk

00184/26/FUL - Full Planning Permission Approved

Proposal

Planning Permission - Erection of 1no. dwelling and construction of vehicular access. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Feb 2026
✓
Validated
26 Feb 2026
✓
Consultation
23 Apr 2026
✓
Approved
11 May 2026

Approved on 11 May 2026 · Delegated Decision · Last checked 1 Aug 2026

Site constraints 4

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, the site is inside its boundary).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Tetney built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
DN36 5NG
Received
5 Feb 2026
Validated
26 Feb 2026
Ward
Tetney Ward
Parish
Tetney
Case officer
Show
Target decision
23 Apr 2026
Decision
Approved
Decision date
11 May 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 74 days from validation, 14 days slower than East Lindsey's median of 60 for new homes. Approved, as 87% of new homes here are.

44%decided within 8 weeks
87%approved
88decided in the last year

Plota live figures for new homes decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 1 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
23 Apr 2026
Consultation
23 Apr 2026
Comments by
8 May 2026
Site or press notice
26 Mar 2026
Statutory expiry
23 Apr 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026