Land West Of Colney Lane Cringleford Norfolk Data via plota.co.uk

2024/3836 - Hybrid Approved

Proposal

Hybrid Application for development of 386 dwellings (Full) and 20 dwelling (outline) use Class C3 including affordable housing, access, car parking, new areas of open space, landscaping, infrastructure and associated works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Dec 2024
✓
Validated
9 Jan 2025
✓
Consultation
13 May 2026
✓
Approved
24 Aug 2026

Approved on 24 Aug 2026 · Development Management Committee · Last checked 18 Oct 2026

Planning committee

Decided by South Norfolk Broadland South Norfolk Development Management (Planning) Committee on 19 Nov 2025.

Approved unanimously

No officer report was published for this decision; this summary is from the committee minutes.

  • The application proposed 406 dwellings with affordable housing, access, parking, open space and associated infrastructure.
  • Members approved delegated authority subject to mitigation, technical details, delivery arrangements and a legal agreement.
  • Members voted unanimously for delegated approval, subject to the stated requirements and conditions.
Read how the committee decided The proposed development, approval requirements, committee vote and conditions.

Source: Plota analysis of South Norfolk Broadland's committee minutes of 19 Nov 2025.

Documents 514

Statements & assessments 91

PDF 0196_c400_p10 Drainage general arrangement Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c400a_p11 Drainage general arrangement Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c400b_p9 Drainage general arrangement Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c403_p7 Drainage drained areas sheet 1 Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c404_p7 Maintenance and management plan (drainage) Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c405_p9 Drainage exceedance plan Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c406_p6 Drainage overland flow Drawing (K) · 5 Jun 2026 View ↗ PDF Drainage amendment summary for revised layout Report (K) · 5 Jun 2026 View ↗ PDF Lead local flood authority Consultee Comment (D) · 16 Mar 2026 View ↗ PDF Lead local flood authority Consultee Comment (D) · 16 Mar 2026 View ↗ PDF Lead local flood authority Consultee Comment (D) · 12 Mar 2026 View ↗ PDF 0196_c400_p9 Drainage ga Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c400a_p10 Drainage ga northside Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c400b_p8 Drainage ga south side Drawing (K) · 17 Feb 2026 View ↗ PDF Lead local flood authority Consultee Comment (D) · 9 Dec 2025 View ↗ PDF Lead local flood authority Consultee Comment (D) · 6 Oct 2025 View ↗ PDF Heritage & design comment Consultee Comment (D) · 24 Sept 2025 View ↗ PDF 0196_c425_p1 Drainage construction details sheet 6 Revised Drawing (K) · 3 Sept 2025 View ↗ PDF 0196_c426_p1 Drainage construction details sheet 7 Revised Drawing (K) · 3 Sept 2025 View ↗ PDF 0196_c400_p5 Drainage general arrangement Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c400a_p5 Drainage general arrangement north side Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c400b_p5 Drainage general arrangement south side Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c401_p4 Drainage constraints plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c402a_p2 Drainage deeper infiltration Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c403_p3 Drainage drained areas sheet 1 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c404_p3 Drainage maintenance and management plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c405_p4 Drainage exceedance plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c406_p2 Drainage overland flow Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c420_p1 Private drainage construction details sheet 1 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c421_p1 Drainage construction details sheet 2 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c422_p1 Drainage construction details sheet 3 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c423_p1 Drainage construction details sheet 4 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c424_p1 Drainage construction details sheet 5 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF Drainage - ffl Report (K) · 26 Aug 2025 View ↗ PDF Ecology and biodiversity officer Consultee Comment (D) · 22 May 2025 View ↗ PDF Senior heritage & design officer Consultee Comment (D) · 14 Apr 2025 View ↗ PDF Consultant response to consultee comments on air quality and noise Correspondence (D) · 25 Mar 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 31 Jan 2025 View ↗
IMG Commenter’s name hidden Show Public Comment (D) · 31 Jan 2025 View ↗
PDF Nutrient neutrality assessment and mitigation strategy BackGround Papers (K) · 10 Jan 2025 View ↗ PDF Statutory bng metric calculation tool Report (K) · 8 Jan 2025 View ↗ PDF Mineral safeguarding assessment and materials management plan- minerals Report (K) · 8 Jan 2025 View ↗ PDF Historic environment desk-based assessment Report (K) · 8 Jan 2025 View ↗ PDF Historic environment desk-based assessment part 2 Report (K) · 8 Jan 2025 View ↗ PDF 3661_10 Biodiversity net gain assessment - design stage Report (K) · 24 Dec 2024 View ↗ PDF Eia volume 2 Environmental statement - appendix 1.1 site location plan Report (K) · 24 Dec 2024 View ↗ PDF Eia volume 2 Environmental statement - appendix 1.2 eia project team Report (K) · 24 Dec 2024 View ↗ PDF Eia volume 2 Environmental statement - appendix 4.1 2022/0548 - screening opinion Report (K) · 24 Dec 2024 View ↗ PDF Eia volume 2 Environmental statement - appendix 4.2 2024/2972 - eia scoping response Report (K) · 24 Dec 2024 View ↗ PDF Eia volume 2 Environmental statement - appendix 6.2 written scheme of investigation - trial t Report (K) · 24 Dec 2024 View ↗ PDF Eia Environmental statement - volume 1 ? main report Report (K) · 24 Dec 2024 View ↗ PDF Eia Environmental statement - volume 3 - non technical summary Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part2 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part4 (1) Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part5 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part6 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part7 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part8 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part9 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part10 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part11 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part12 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part13 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part14 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part15 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part16 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report - appendix a - topographical survey Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report - appendix b - site investigation report aw asswt r Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report - appendix c - proposed site plan Report (K) · 24 Dec 2024 View ↗ PDF Statement of community involvement - november 2024 Report (K) · 24 Dec 2024 View ↗ PDF Information to inform habitats regulations assessment Report (K) · 24 Dec 2024 View ↗ PDF R9355-2 rev 1 Noise vibration and air quality impact a Report (K) · 24 Dec 2024 View ↗ PDF Noise impact assessment_included_in_air quality assessment Report (K) · 24 Dec 2024 View ↗ PDF R9355-4 rev 1 Air source heat pump noise assessment Report (K) · 24 Dec 2024 View ↗ PDF Sustainability statement Report (K) · 24 Dec 2024 View ↗ PDF Bha_698_01b Tree survey and constraints plan Drawing (K) · 24 Dec 2024 View ↗ PDF Bha_6146 Arboricultural impact assessment Report (K) · 24 Dec 2024 View ↗ PDF Bha_6146 Tree survey schedule Report (K) · 24 Dec 2024 View ↗ PDF Planning statement Report (K) · 24 Dec 2024 View ↗ PDF 1.1 cringleford heights phase 2 transport assessment 2024 - final(16191065.1) Report (K) · 24 Dec 2024 View ↗ PDF 1.2 cringleford heights phase 2 transport assessment 2024 - final(16191065.1) Report (K) · 24 Dec 2024 View ↗ PDF 1.3 cringleford heights phase 2 transport assessment 2024 - final(16191065.1) Report (K) · 24 Dec 2024 View ↗ PDF 1.4 cringleford heights phase 2 transport assessment 2024 - final(16191065.1) Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_102_pl_v1 Design and access statement sections 1-3 Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_102_pl_v1 Design and access statement - sections 4-5 Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_102 Design and access statement - sections 6 Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_102_pl_v1 Design and access statement - sections 7-9 Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_102_pl_v Design and access statement - sections 10 Report (K) · 24 Dec 2024 View ↗ PDF Fra drainage strategy report_rev c_part1 Report (K) · 24 Dec 2024 View ↗ PDF Ecological impact assessment - part 2 Report (K) · 24 Dec 2024 View ↗ PDF Ecological impact assessment - part 1 Appeal Correspondence (D) · 24 Dec 2024 View ↗

Plans & drawings 232

PDF J0051389 - 141 - v2 Triple garage Drawing (K) · 13 Aug 2026 View ↗ PDF J0051389_cj_mp_001_v1 Location plan Drawing (K) · 11 Aug 2026 View ↗ PDF 60880_pp_005a Sorrel grove access 3.0m footway/cycleway and priority traffic management optio Drawing (K) · 10 Aug 2026 View ↗ PDF H8787_2a_sl_004c Land use master plan Drawing (K) · 10 Aug 2026 View ↗ PDF J0051389 - 126-m - v2 Sh50 Drawing (K) · 21 Jul 2026 View ↗ PDF J0051389 - 137 - v3 Aa47 - floorplans Drawing (K) · 21 Jul 2026 View ↗ PDF J0051389 - 137 - v6 Aa47 elevations Drawing (K) · 21 Jul 2026 View ↗ PDF Drawing issue sheet 1 Report (K) · 5 Jun 2026 View ↗ PDF Drawing issue sheet 2 Report (K) · 5 Jun 2026 View ↗ PDF 0196_c120_p7 Proposed highway vehicle tracking sheet 1 of 9 snc mercedes econic 8x4 refuse ve Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c121a_p7 Proposed highway vehicle tracking sheet 2 of 9 snc mercedes econic 8x4 refuse v Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c121b_p8 Proposed highway vehicle tracking sheet 3 of 9 snc mercedes econic 8x4 refuse v Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c122_p7 Proposed highway vehicle tracking sheet 4 of 9 fire appliance Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c123a_p7 Proposed highway vehicle tracking sheet 5 of 9 fire appliance Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c123b_p7 Proposed highway vehicle tracking sheet 6 of 9 fire appliance Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c124_p7 Proposed highway vehicle tracking sheet 7 of 9 mercedes sprinter delivery van Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c125a_p6 Proposed highway vehicle tracking sheet 8 of 9 mercedes sprinter delivery van Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c125b_p6 Proposed highway vehicle tracking sheet 9 of 9 mercedes sprinter delivery van Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c130a_p5 Visibility splay Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c130b_p5 Visibility splay Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c135_p5 Speed restraints Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c136_p4 Road dimensions Drawing (K) · 5 Jun 2026 View ↗ PDF 5300-lan-xx-xx-dr-l-1002-p16 Landscape masterplan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_020_v7 Materiality plan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_021_v9 Detailed layout (406 units Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_022_v7 Tenure strategy plan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_023_v7 Refuse strategy plan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_024_v7 Parking strategy plan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_025_v7 Roof plan Drawing (K) · 5 Jun 2026 View ↗ PDF J0051389_cj_mp_026_v7 Boundary strategy plan Drawing (K) · 5 Jun 2026 View ↗ PDF 0196_c403_p6 Drained area plan Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c404_p6 Drainiage maintenance & management plan Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c405_p8 Exceedance flow Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c406_p5 Overland flow Drawing (K) · 17 Feb 2026 View ↗ PDF Drawing issue sheet Report (K) · 17 Feb 2026 View ↗ PDF 0196_c120_p6 Tracking plan shet 1 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c121a_p6 Tracking plan sheet 2 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c121b_p7 Tracking plan sheet 3 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c122_p6 Tracking plan sheet 4 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c123a_p6 Tracking plan sheet 5 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c123b_p6 Tracking plan sheet 6 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c124_p6 Tracking plan sheet 7 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c125a_p5 Tracking plan sheet 8 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c125b_p5 Tracking plan sheet 9 Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c130a_p4 Visibility splays Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c130b_p4 Visibility splays Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c135_p4 Speed restraints Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_c136_p3 Road dimensions Drawing (K) · 17 Feb 2026 View ↗ PDF 0196_sk010_sk2 Tracking sketch Drawing (K) · 17 Feb 2026 View ↗ PDF Hm205_p1 Drawing Drawing (K) · 17 Feb 2026 View ↗ PDF Hm215_p1 Drawing Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_001_v2 Cringleford location plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_020_v6 Materiality plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_021_v7 Detailed layout Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_022_v6 Tenure strategy plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_023_v6 Refuse strategy plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_024_v6 Parking strategy plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_025_v6 Roof plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_026_v6 Boundary strategy plan Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389 - 130-g - v3 Great dunmow floorplans (ground floor) Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389 - 130-g - v3 Great dunmow floorplans (first floor) Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389 - 130-g - v3 Great dunmow floorplans (second floor) Drawing (K) · 17 Feb 2026 View ↗ PDF J0051389_cj_mp_001_v1 Location plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_020_v4 Materiality plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_021_v5 Detailed layout Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_022_v5 Tenure strategy plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_023_v4 Refuse strategy plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_024_v4 Parking strategy plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_025_v4 Roof plan Drawing (K) · 12 Nov 2025 View ↗ PDF J0051389_cj_mp_026_v4 Boundary strategy plan Drawing (K) · 12 Nov 2025 View ↗ PDF 0196_c120_p4 Tracking plan sheet 1 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c121a_p4 Tracking plan sheet 2 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c121b_p5 Tracking plan sheet 3 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c122_p4 Tracking plan sheet 4 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c123a_p4 Tracking plan sheet 5 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c123b_p4 Tracking plan sheet 6 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c124_p4 Tracking plan sheet 7 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c125a_p3 Tracking plan sheet 8 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c125b_p3 Tracking plan sheet 9 Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c130a_p2 Visiblity splays Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c130b_p2 Visiblity splays Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c135_p2 Road dimensions Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c135_p2 Speed restraints Drawing (K) · 23 Oct 2025 View ↗ PDF 0196_c426_p2 Construction details sheet 7 Drawing (K) · 23 Oct 2025 View ↗ PDF 5300-lan-xx-xx-dr-l-1002-p14 Landscape masterplan Drawing (K) · 23 Oct 2025 View ↗ PDF 60880/pp/001 Proposed toucan crossing Drawing (K) · 23 Oct 2025 View ↗ PDF J0051389_cj_mp_021_pl_v5_bdw Detailed layout (pre-render) Drawing (K) · 23 Oct 2025 View ↗ PDF C-405 Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF C400 Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF C402a Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF C400a Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF C001 Drawing & photos Drawing (K) · 15 Oct 2025 View ↗ PDF Hm003 Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF Hm002 Drawing Drawing (K) · 15 Oct 2025 View ↗ PDF Hm205_p1 Hydraulic modelling proposed scenario q100+cc_30min tilia link road constructed Revised Drawing (K) · 3 Sept 2025 View ↗ PDF 5300-lan-xx-xx-dr-l-1002-p13 Landscape masterplan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389_cj_mp_001_v1 Location plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389-cj-mp-020-v3 Materiality plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389-cj-mp-021-v4 Detailed layout (406 units) Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389-cj-mp-022-v4 Tenure strategy plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389_cj_mp_023_v3 Refuse strategy plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389_cj_mp_024_v3 Parking strategy plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389_cj_mp_025_v3 Roof plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF J0051389_cj_mp_026_v3 Boundary strategy plan Revised Drawing (K) · 26 Aug 2025 View ↗ PDF Gn23826 - dr402a - a3-l Fieldwork location plan - trial pits - proposed development layout - north site Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - dr402b - a3-l Fieldwork location plan - trial pit - proposed development layout - south site Report (K) · 26 Aug 2025 View ↗ PDF 0196_c120_p3 Proposed highway tracking sheet 1 of 9 - snc mercedes econic 8x4 refuse vehicle Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c121a_p3 Proposed highway tracking sheet 2 of 9 - snc mercedes econic 8x4 refuse vehicle Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c121b_p3 Proposed highway tracking sheet 3 of 9 - snc mercedes econic 8x4 refuse vehicle Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c122_p3 Proposed highway tracking sheet 4 of 9 - fire appliance Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c123a_p3 Proposed highway tracking sheet 5 of 9 - fire appliance Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c123b_p3 Proposed highway tracking sheet 6 of 9 - fire appliance Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c124_p3 Proposed highway tracking sheet 7 of 9 - mercedes sprinter delivery van Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c125a_p2 Proposed highway vehicle tracking sheet 8 of 9 - mercedes sprinter delivery van Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c125b_p2 Proposed highway vehicle tracking sheet 9 of 9 - mercedes sprinter delivery van Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c130_p1 Forward visibility splay Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c135_p1 Speed restraints Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c402_p3 Ground improvement sheet 1 Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c427_p3 Proposed basin sections Revised Drawing (K) · 26 Aug 2025 View ↗ PDF 0196_c428-p1 Bund basin sections Revised Drawing (K) · 26 Aug 2025 View ↗ PDF Gn23826 - dr004 Fieldwork location plan Drawing (K) · 17 Apr 2025 View ↗ IMG Cringleford visualisation 1 Drawing (K) · 24 Dec 2024 View ↗ IMG Cringleford visualisation 2 Drawing (K) · 24 Dec 2024 View ↗ IMG Cringleford visualisation 3 Drawing (K) · 24 Dec 2024 View ↗ PDF 3661_11 Habitat management and monitoring plan Report (K) · 24 Dec 2024 View ↗ PDF Drawing issue sheet 1 Report (K) · 24 Dec 2024 View ↗ PDF Drawing issue sheet 2 Report (K) · 24 Dec 2024 View ↗ PDF J0051389 - 101-r - v4 Allerthorpe Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 102 - v2 Charnwood -floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 102 - v3 Charnwood - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 102-r - v4 Charnwood render - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 103 - v2 Holywell Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 103-g - v3 Holywell Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 103-m - v2 Holywell Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 104-r - v4 Kelling Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 104-s - v4 Kelling Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 105 - v2 Kew Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 105-g - v3 Kew Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 105-m - v2 Kew Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 106 - v2 Knightwood - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 106 - v3 Knightwood - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 106-m - v2 Knightwood - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 106-r - v4 Knightwood - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 107-s - v4 Martham Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 108 - v2 Matlock Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 108-g - v3 Matlock Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 108-m - v2 Matlock Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 109 - v2 Mewstone Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 109-g - v3 Mewstone Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 109-m - v1 Mewstone Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 110-g - v3 Redford Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 110-r - v4 Redford Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 110-s - v3 Redford Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 111-s - v3 Rowan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 112 - v2 Salthome Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 113-g - v3 Tollie Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 114 - v3 Alder Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 114-m - v3 Alder Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 115 - v2 Beckingham - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 115 - v2 Beckingham - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 116 - v2 Conwy - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 116 - v2 Conwy Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 116-w - v5 Conwy - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 117 - v2 Dunnet Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 118 - v2 Fairburn - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 118 - v2 Fairburn - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 118-w - v4 Fairburn - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 119 - v2 Foxglove - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 119 - v3 Foxglove - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 119-r - v4 Foxglove - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 120 - v2 Hamford Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 121 - v2 Hoveton Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 121-r - v3 Hoveton Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 122-r - v4 Langham Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 123 - v2 Ollerton - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 123 - v2 Ollerton - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 123-w - v3 Ollerton - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 124 - v2 Sudbury - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 124 - v2 Sudbury - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 124-w - v3 Sudbury - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 125 - v2 Belbroughton - floorplan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 125 - v3 Belbroughton - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 125-w - v4 Belbroughton - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 126 - v2 Sh50 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 126-g - v4 Sh50 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 127 - v2 Sh52 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 127 - v2 Sh52 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 127-g - v4 Sh52 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 128 - v2 Sh55 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 128 - v4 Sh55 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 128-r - v4 Sh55 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 129 - v2 Type 50 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 129-m - v1 Type 50 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 130-g - v2 Great dunmow - floorplans (ground floor) Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 130-g - v2 Great dunmow - floorplans (first floor) Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 130-g - v2 Great dunmow - floorplans (second floor) Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 130-g - v4 Great dunmow - elevations ( rear and side) Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 130-g - v4 Great dunmow - elevations (front and side) Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 131-g - v2 N2b8 n2b9 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 131-g - v3 N2b8 n2b9 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 132 - v3 Guelder Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 133 - v3 Holm Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 134 - v2 Type 52 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 134 - v2 Type 52 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 134-m - v2 Type 52 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 135 - v2 Type 54 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 135 - v2 Type 54 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 136 - v2 Type 55 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 136 - v3 Type 55 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 136-s - v3 Type 55 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 137 - v2 Aa47 - floorplans Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 137 - v3 Aa47 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 138 - v2 Ayb3 - floorplan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 138 - v2 Ayb3 - elevations Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 139 - v2 Single garage Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 140 - v2 Double garage Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389 - 141 - v2 Shared twin garage Drawing (K) · 24 Dec 2024 View ↗ PDF 5300-lan-xx-xx-dr-l-1003-p07 Open space area drawing Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_001_v1 Site location plan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_021_v3 Detailed layout - 406 units Drawing (K) · 24 Dec 2024 View ↗ PDF Gn23826 - dr004 Fieldwork location plan Drawing (K) · 24 Dec 2024 View ↗ PDF Gn23826 - sa201a-203 Final trial pits logs - reduced Drawing (K) · 24 Dec 2024 View ↗ PDF Gn23826 - sa201a-203 Final trial pit logs Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_v2 Streetscenes a-aa and b-bb Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_v2 Streetscenes c-cc and d-dd Drawing (K) · 24 Dec 2024 View ↗ PDF Cringleford heights phase 2 travel plan 2024 final Report (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_020_v2_ Materiality plan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_022_v3 Tenure strategy plan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_023_v2_ Refuse strategy plan_a01000 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_024_v2 Parking strategy plan_a01000 Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_025_v2 Roof plan Drawing (K) · 24 Dec 2024 View ↗ PDF J0051389_cj_mp_026_v2 Boundary strategy plan Drawing (K) · 24 Dec 2024 View ↗

Consultation & comments 83

PDF Natural england Consultee Comment (D) · 12 Jun 2026 View ↗ PDF Additional consultation request Officer Notes · 13 May 2026 View ↗ PDF Highway comments Consultee Comment (D) · 7 Apr 2026 View ↗ PDF Ncc planning obligations Consultee Comment (D) · 16 Mar 2026 View ↗ PDF Ncc planning obligations Consultee Comment (D) · 16 Mar 2026 View ↗ PDF Environment agency Consultee Comment (D) · 12 Mar 2026 View ↗ PDF Nn correspondence Consultee Comment (D) · 10 Mar 2026 View ↗ PDF Housing enabling officer Consultee Comment (D) · 9 Mar 2026 View ↗ PDF Designing out crime officer Consultee Comment (D) · 6 Mar 2026 View ↗ PDF Cringleford parish council Consultee Comment (D) · 5 Mar 2026 View ↗ PDF District councilllor - d sacks Consultee Comment (D) · 27 Feb 2026 View ↗ PDF Norwich international airport Consultee Comment (D) · 26 Feb 2026 View ↗ PDF Norwich international airport Consultee Comment (D) · 26 Feb 2026 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 24 Feb 2026 View ↗
PDF Water management alliance Consultee Comment (D) · 24 Feb 2026 View ↗ PDF Water management alliance Consultee Comment (D) · 24 Feb 2026 View ↗ PDF Environmental quality team Consultee Comment (D) · 24 Feb 2026 View ↗ PDF Nhs norfolk & waveney icb Consultee Comment (D) · 24 Feb 2026 View ↗ PDF Re-consultation instruction Officer Notes · 23 Feb 2026 View ↗ PDF Anglian water services ltd Consultee Comment (D) · 23 Feb 2026 View ↗ PDF Nutrient neutrality Consultee Comment (D) · 23 Feb 2026 View ↗ PDF Llfa comments response Correspondence (D) · 17 Feb 2026 View ↗ PDF Response from llfa Correspondence (D) · 17 Feb 2026 View ↗ PDF Nutrient neutrality team Consultee Comment (D) · 17 Dec 2025 View ↗ PDF Additional consultation instruction Officer Notes · 3 Dec 2025 View ↗ PDF Ncc highways Consultee Comment (D) · 7 Nov 2025 View ↗ PDF Re-consultation instruction Officer Notes · 6 Nov 2025 View ↗ PDF Eot request llfa Consultee Comment (D) · 6 Nov 2025 View ↗ PDF Parish council Consultee Comment (D) · 6 Nov 2025 View ↗ PDF Response to llfa Report (K) · 23 Oct 2025 View ↗ PDF Re-consultation email Correspondence (D) · 23 Oct 2025 View ↗ PDF Schema response Correspondence (D) · 15 Oct 2025 View ↗ PDF Parish council comment Consultee Comment (D) · 2 Oct 2025 View ↗ PDF Anglian water comment Consultee Comment (D) · 29 Sept 2025 View ↗ PDF Highways comment Consultee Comment (D) · 26 Sept 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 24 Sept 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 21 Sept 2025 View ↗
PDF Environment agency comment Consultee Comment (D) · 19 Sept 2025 View ↗ PDF Environmental management comments Consultee Comment (D) · 18 Sept 2025 View ↗ PDF Historic environment comment Consultee Comment (D) · 17 Sept 2025 View ↗ PDF Norfolk and waveney integrated care system (ics) Consultee Comment (D) · 9 Sept 2025 View ↗ PDF Designing out crime officer comment Consultee Comment (D) · 8 Sept 2025 View ↗ PDF Public comment Public Comment (D) · 8 Sept 2025 View ↗ PDF Water management alliance Consultee Comment (D) · 5 Sept 2025 View ↗ PDF Parish councile extension of time request Consultee Comment (D) · 5 Sept 2025 View ↗ PDF Norwich airport Consultee Comment (D) · 5 Sept 2025 View ↗ PDF Housing enabling officer Consultee Comment (D) · 4 Sept 2025 View ↗ PDF Response to llfa comments Report (K) · 26 Aug 2025 View ↗ PDF Environment agency Consultee Comment (D) · 13 Aug 2025 View ↗ PDF Re consultation request Officer Notes · 15 Jul 2025 View ↗ PDF Environmental quality team Consultee Comment (D) · 8 Apr 2025 View ↗ PDF East anglia air ambulance Consultee Comment (D) · 1 Apr 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 27 Mar 2025 View ↗
PDF Officer request for reconsultation BackGround Papers (K) · 26 Mar 2025 View ↗ PDF Officer request for reconsultation BackGround Papers (K) · 26 Mar 2025 View ↗ PDF East of england ambulance service Consultee Comment (D) · 19 Mar 2025 View ↗ PDF Planning obligations team Consultee Comment (D) · 13 Mar 2025 View ↗ PDF District councillor comment Consultee Comment (D) · 28 Feb 2025 View ↗ PDF Llfa comments Consultee Comment (D) · 26 Feb 2025 View ↗ PDF Ncc growth and investment comments Consultee Comment (D) · 11 Feb 2025 View ↗ PDF Anglian water comments Consultee Comment (D) · 10 Feb 2025 View ↗ PDF Water management alliance comments Consultee Comment (D) · 10 Feb 2025 View ↗ PDF Water management alliance comments Consultee Comment (D) · 10 Feb 2025 View ↗ PDF Cringleford parish council Consultee Comment (D) · 7 Feb 2025 View ↗ PDF Public health officer Consultee Comment (D) · 7 Feb 2025 View ↗ PDF Nhs Consultee Comment (D) · 7 Feb 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 7 Feb 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 6 Feb 2025 View ↗
PDF Llfa comments Consultee Comment (D) · 5 Feb 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 31 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 30 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 29 Jan 2025 View ↗
PDF Housing enabling officer comments Consultee Comment (D) · 28 Jan 2025 View ↗ PDF Housing enabling officer Consultee Comment (D) · 28 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 27 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 27 Jan 2025 View ↗
PDF Designing out crime officer Consultee Comment (D) · 22 Jan 2025 View ↗ PDF Historic environment comments Consultee Comment (D) · 21 Jan 2025 View ↗ PDF Environmental quality team comments Consultee Comment (D) · 20 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 17 Jan 2025 View ↗
PDF Norwich airport comments Consultee Comment (D) · 16 Jan 2025 View ↗
PDF Commenter’s name hidden Show Public Comment (D) · 14 Jan 2025 View ↗
PDF Water management alliance comments Consultee Comment (D) · 14 Jan 2025 View ↗

Other documents 100

PDF Discharge of obligation BackGround Papers (K) · 7 Sept 2026 View ↗ PDF Cil - social housing relief claim CIL Documentation (K) · 2 Sept 2026 View ↗ PDF Cil - social housing relief granted CIL Documentation (K) · 2 Sept 2026 View ↗ PDF Cil - demand notice CIL Documentation (K) · 2 Sept 2026 View ↗ PDF Assumption of liability CIL Documentation (K) · 27 Aug 2026 View ↗ PDF Commencement notice CIL Documentation (K) · 27 Aug 2026 View ↗ PDF Ack aol and comm CIL Documentation (K) · 27 Aug 2026 View ↗ PDF Cil cover letter CIL Documentation (K) · 24 Aug 2026 View ↗ PDF Cil liability notice CIL Documentation (K) · 24 Aug 2026 View ↗ PDF S106 final completed copy Legal Agreement (K) · 21 Aug 2026 View ↗ PDF Extension of time agreement Correspondence (D) · 21 Aug 2026 View ↗ PDF S106 agreement - working draft (unsigned) Legal Agreement (K) · 13 Aug 2026 View ↗ PDF Cil - plot schedule CIL Documentation (K) · 12 Aug 2026 View ↗ PDF Completed nn s106 agreement trustee signed Legal Agreement (K) · 23 Jul 2026 View ↗ PDF Completed nn s106 agreement - mortgagee signed Legal Agreement (K) · 23 Jul 2026 View ↗ PDF Completed nn s106 agreement - bdc signed Legal Agreement (K) · 23 Jul 2026 View ↗ PDF Draft nn s106 land reversion scheme Legal Agreement (K) · 1 Jul 2026 View ↗ PDF Girams hra Report (K) · 13 May 2026 View ↗ PDF Draft nn hra & aa Report (K) · 12 May 2026 View ↗
PDF Name hidden Show Correspondence (D) · 11 May 2026 View ↗
PDF Returned post Correspondence (D) · 22 Apr 2026 View ↗
PDF Name hidden Show Correspondence (D) · 2 Apr 2026 View ↗
PDF Returned post - address inaccessible Correspondence (D) · 31 Mar 2026 View ↗
PDF Name hidden Show Correspondence (D) · 13 Mar 2026 View ↗
PDF Name hidden Show Correspondence (D) · 13 Mar 2026 View ↗
PDF Name hidden Show Correspondence (D) · 13 Mar 2026 View ↗
PDF Name hidden Show Correspondence (D) · 13 Mar 2026 View ↗
PDF V3 Land reversion hra and appendices Report (K) · 10 Mar 2026 View ↗ PDF Press advert BackGround Papers (K) · 26 Feb 2026 View ↗ PDF Superseded Land reversion hra Report (K) · 18 Feb 2026 View ↗ PDF Superseded Land reversion hra - appendix 1 Report (K) · 18 Feb 2026 View ↗ PDF Issue sheet Report (K) · 17 Feb 2026 View ↗ PDF Ph2 si report part 1 of 5 Report (K) · 17 Feb 2026 View ↗ PDF Ph2 si report part 2 of 5 Report (K) · 17 Feb 2026 View ↗ PDF Ph2 si report part 3 of 5 Report (K) · 17 Feb 2026 View ↗ PDF Ph2 si report part 4 of 5 Report (K) · 17 Feb 2026 View ↗ PDF Ph2 si report part 5 of 5 Report (K) · 17 Feb 2026 View ↗ PDF Email to llfa Correspondence (D) · 17 Feb 2026 View ↗ PDF Gfr with 1 year Report (K) · 17 Feb 2026 View ↗ PDF Correspondence Correspondence (D) · 17 Feb 2026 View ↗ PDF Suds banking coefficient calculations BackGround Papers (K) · 12 Jan 2026 View ↗ PDF Revised nnams BackGround Papers (K) · 12 Jan 2026 View ↗ PDF Eot request from the parish council BackGround Papers (K) · 29 Oct 2025 View ↗ PDF Proposed toucan crossing Report (K) · 23 Oct 2025 View ↗ PDF Covering letter scheme amendments Correspondence (D) · 23 Oct 2025 View ↗ PDF Design settings report Report (K) · 15 Oct 2025 View ↗ PDF Design settings report -2 Report (K) · 15 Oct 2025 View ↗ PDF Design settings report -3 Report (K) · 15 Oct 2025 View ↗ PDF Design settings report -4 Report (K) · 15 Oct 2025 View ↗ PDF Simulation settings Report (K) · 15 Oct 2025 View ↗ PDF Site investigation report Report (K) · 15 Oct 2025 View ↗ PDF Nh emails Correspondence (D) · 15 Oct 2025 View ↗ PDF Nh emails Correspondence (D) · 15 Oct 2025 View ↗
PDF Name hidden Show Correspondence (D) · 25 Sept 2025 View ↗
PDF Name hidden Show Correspondence (D) · 25 Sept 2025 View ↗
PDF Revised submission covering letter Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 Draft sa logs 250416 Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - sa302-312 Draft report - soakaway tests Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - sa302-312 Draft tp logs Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - sa302-314 Draft tp logs Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - sa302-314a Report - soakaway tests Report (K) · 26 Aug 2025 View ↗ PDF Gn23826 - sa303, 308 & 311 Draft report - soakaway tests Report (K) · 26 Aug 2025 View ↗ PDF 0196_sw Network_north 100yr +10yr event Report (K) · 26 Aug 2025 View ↗ PDF 0196_sw Network_north 100yr+45%cc, 30yr+40%c Report (K) · 26 Aug 2025 View ↗ PDF 0196_sw Network_south 100yr +10yr event Report (K) · 26 Aug 2025 View ↗ PDF 0196_sw Network_south 100yr+45%cc, 30yr+40%cc Report (K) · 26 Aug 2025 View ↗ PDF Hm215_p1 Hydraulic modelling existing scenario q100+cc_30min no a47 sub catchment propose Report (K) · 26 Aug 2025 View ↗ PDF Pnm03-nrc-z1-nr1-tr-w-0001 - r1.5 Nnams part 1 Report (K) · 12 Aug 2025 View ↗ PDF Pnm03-nrc-z1-nr1-tr-w-0001 - r1.5 Nnams part 2 Report (K) · 12 Aug 2025 View ↗ PDF Pnm03-nrc-z1-nr1-tr-w-0001 - r1.5 Nnams part 3 Appeal Correspondence (D) · 12 Aug 2025 View ↗ PDF Water resource information submitted Report (K) · 15 Jul 2025 View ↗ PDF Gn23826 - sa201a-203 Trial pit logs Report (K) · 17 Apr 2025 View ↗ PDF Gn23826 - sa201a-203 Soakaway tests modified Report (K) · 17 Apr 2025 View ↗ PDF Gn23826 ssi Supplementary site investigation report Report (K) · 17 Apr 2025 View ↗ PDF Gn23826 si report Site investigation report - part 1 Report (K) · 17 Apr 2025 View ↗ PDF Gn23826 si report Site investigation report - part 2 Report (K) · 17 Apr 2025 View ↗ PDF Phase 2 hydraulic modelling report rev a Report (K) · 7 Feb 2025 View ↗ PDF Issue sheet 1 BackGround Papers (K) · 7 Feb 2025 View ↗ PDF Issue sheet 2 BackGround Papers (K) · 7 Feb 2025 View ↗ PDF Appendix a Report (K) · 7 Feb 2025 View ↗ PDF Appendix b Report (K) · 7 Feb 2025 View ↗ PDF Appendix c Report (K) · 7 Feb 2025 View ↗ PDF Appendix d Report (K) · 7 Feb 2025 View ↗ PDF Appendix e Report (K) · 7 Feb 2025 View ↗ PDF Eot request- ncc planning obligations team BackGround Papers (K) · 31 Jan 2025 View ↗
PDF Name hidden Show Correspondence (D) · 24 Jan 2025 View ↗
PDF Press advert BackGround Papers (K) · 16 Jan 2025 View ↗ PDF Nutrient calculator Report (K) · 13 Jan 2025 View ↗ PDF J0051389_cj_cringleford phase 2 Land use and accommodation schedule Report (K) · 24 Dec 2024 View ↗ PDF J0051389 Housing mix - phase 2_plot schedule_241212 Report (K) · 24 Dec 2024 View ↗ PDF 5300-lan-xx-xx-dr-l-1002-p11 Landscape masterplan Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal - appendix 1 figures 1-10 part1 Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal - appendix 1 figures 1-10 part 2 Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal - appendix 2 site photography figure 11 Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal - appendix 3 lva viewpoint photography Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal - appendix 4 & 5 Report (K) · 24 Dec 2024 View ↗ PDF Landscape and visual appraisal Report (K) · 24 Dec 2024 View ↗ PDF Gn23826 - sa201a-203 Report - soakaway tests modified - reduced Report (K) · 24 Dec 2024 View ↗ PDF Gn23826 - sa201a-203 Report - soakaway tests modified Report (K) · 24 Dec 2024 View ↗ PDF Hydraulic modelling report_rev a Report (K) · 24 Dec 2024 View ↗

All documents on the council site ↗

Site constraints 4

Nutrient neutrality catchment: Yare Broads and Marshes
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
National infrastructure project about 1091 m away: A47 - A11 Thickthorn Junction; Inside the Cringleford built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 19 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Hybrid
Received
24 Dec 2024
Validated
9 Jan 2025
Ward
Cringleford
Parish
Cringleford
Case officer
Show
Target decision
24 Aug 2026
Decision
Approval with Conditions
Decision date
24 Aug 2026
Decision level
Development Management Committee
Applicant
Show
Agent
Carter Jonas LLP

How this decision compares

Decided in 592 days from validation, 498 days slower than South Norfolk Broadland's median of 94 for full applications. Approved, as 86% of full applications here are.

24%decided within 8 weeks
86%approved
11%go to committee

Plota live figures for full applications decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

11comments received
9 objecting2 neutral

82% object · above the UK average of 74%

153 neighbours consulted · Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13526348
Planning Portal ref
PP-13526348
Neighbours
23 Feb 2026
Consultation
13 May 2026
Comments by
4 Jun 2026
Site or press notice
25 Feb 2026
Committee
19 Nov 2025
Statutory expiry
1 May 2025
Env. assessment
Yes
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 councils
Relevant to this application:
Major dwellings

South Norfolk Broadland ranks #136 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026