90 High Street, Wrestlingworth, Sandy, SG19 2EJ Data via plota.co.uk

CB/26/00677/FULL - Full Application Approved

Proposal

Siting of a new oil tank and concrete base Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Mar 2026
✓
Validated
12 Mar 2026
✓
Approved
30 Apr 2026

Approved on 30 Apr 2026 · Last checked 13 Oct 2026

Site constraints 3

Also on the record
1 listed building within 150 m of the postcode pin; Inside the Wrestlingworth built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Central Bedfordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
SG19 2EJ
Received
2 Mar 2026
Validated
12 Mar 2026
Parish
Wrestlingworth/Cockayne Hatley
Case officer
Show
Target decision
7 May 2026
Decision
Full Application - Granted Conditions or Reasons: View Conditions or Reasons Informative Notes: 1 )Reasons for Granting The site comprises a two-storey detached dwelling at 90 High Street Wrestlingworth, constructed of brick with front hanging tiles, concrete roof tiles, and white uPVC windows. It is bounded by residential development including No 88, a Grade II listed building, and No 92, which is of similar age and design to No 90. ��� The proposal is for a new green painted metal oil tank measuring some 1.68m high, 1.8 long and 0.6m wide which would be sited on a slightly larger concrete base and adjacent to an existing fence on the side boundary with No 92. Although the material and finish do not reflect the character of the dwelling and would be forward of the dwelling, the tanks modest size, set back position from the road frontage, and slim profile mean it would not appear dominant in the streetscene, and its screening is not necessary to secure by condition.� Overall, the proposal would not result in harm to the character and appearance of the area. The oil tank would be well offset from No 88 High Street, with soft landscaping along the shared boundary, and would not adversely affect the setting of that adjacent Grade II listed building. The proposed oil tank would be screened from No 92 by the existing boundary fence. Given the siting and modest scale of the proposed development, no surrounding properties would be unduly affected. On the basis of the scale and nature of the development, adequate access and parking has been retained. The SuDs team have commented that the development would not affect surface water drainage or flood risk and therefore have no comment to make. The Tree Officer, Archaeology Team, and Pollution Team have no objection to the proposal.� Neighbouring properties have been consulted on the application and no comments have been received. Wrestlingworth Parish Council were consulted and have not commented. In light of the foregoing appraisal, it is considered that the proposal would be in accordance with Policies HQ1 of the Adopted Central Bedfordshire Local Plan (2021), the Adopted Central Bedfordshire Design Guide (August 2023), and Section 12 of the NPPF (2024). �Reasons for Granting The site comprises a two-storey detached dwelling at 90 High Street Wrestlingworth, constructed of brick with front hanging tiles, concrete roof tiles, and white uPVC windows. It is bounded by residential development including No 88, a Grade II listed building, and No 92, which is of similar age and design to No 90. ��� The proposal is for a new green painted metal oil tank measuring some 1.68m high, 1.8 long and 0.6m wide which would be sited on a slightly larger concrete base and adjacent to an existing fence on the side boundary with No 92. Although the material and finish do not reflect the character of the dwelling and would be forward of the dwelling, the tanks modest size, set back position from the road frontage, and slim profile mean it would not appear dominant in the streetscene, and its screening is not necessary to secure by condition.� Overall, the proposal would not result in harm to the character and appearance of the area. The oil tank would be well offset from No 88 High Street, with soft landscaping along the shared boundary, and would not adversely affect the setting of that adjacent Grade II listed building. The proposed oil tank would be screened from No 92 by the existing boundary fence. Given the siting and modest scale of the proposed development, no surrounding properties would be unduly affected. On the basis of the scale and nature of the development, adequate access and parking has been retained. The SuDs team have commented that the development would not affect surface water drainage or flood risk and therefore have no comment to make. The Tree Officer, Archaeology Team, and Pollution Team have no objection to the proposal.� Neighbouring properties have been consulted on the application and no comments have been received. Wrestlingworth Parish Council were consulted and have not commented. In light of the foregoing appraisal, it is considered that the proposal would be in accordance with Policies HQ1 of the Adopted Central Bedfordshire Local Plan (2021), the Adopted Central Bedfordshire Design Guide (August 2023), and Section 12 of the NPPF (2024). � 2 )Based on information submitted there are no known issues raised in the context of Human Rights / The Equalities Act 2010 and as such there would be no relevant implications.Based on information submitted there are no known issues raised in the context of Human Rights / The Equalities Act 2010 and as such there would be no relevant implications. 3 )GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF).GDP Policy Informative Central Beds Local Plan In accordance with Article 35 (1) of the Town and Country Planning (Development Management Procedure) (England) Order 2015, the reason for any condition above relates to the Policies as referred to in the Central Bedfordshire Local Plan and the National Planning Policy Framework (NPPF). 4 )This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.This permission relates only to that required under the Town & Country Planning Acts and does not include any consent or approval under any other enactment or under the Building Regulations. Any other consent or approval which is necessary must be obtained from the appropriate authority.
Decision date
30 Apr 2026

How this decision compares

Decided in 49 days from validation, 10 days faster than Central Bedfordshire's median of 59 for utility and infrastructure works. Approved, as 88% of utility and infrastructure works here are.

48%decided within 8 weeks
88%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Central Bedfordshire in the last twelve months, from validation. Central Bedfordshire decision record →

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
12 Mar 2026
Comments by
24 Apr 2026
Central Bedfordshire
Planning Authority Score
6.3/10
Average
#88 of 296 councils
Relevant to this application:
Householder decisions

Central Bedfordshire is faster than most councils at deciding householder applications, ranking #62 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Central Bedfordshire decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #218 of 296
91%
Householder approved
Above avg (90%) #169 of 296
76%
Decided in 8 weeks
Above avg (63%) #62 of 296
35%
Extended time limit
Below avg (41%) #99 of 296
61%
Minor dwellings approved
153 decided (1-9 homes)
86%
Major dwellings approved
29 decided (10+ homes)
73%
Change of use approved
45 decided
1,444
Total decisions
226 refused in the year to March 2026