9 Chapel Close, Chew Stoke, Bristol, Bath And North East Somerset, BS40 8XX Data via plota.co.uk

26/03680/FUL - Full Application Pending Consideration

Proposal

Construction of a single-storey side extension, an open-sided carport and roof-mounted solar PV panels together with rendered external walls Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Sept 2026
Decision
Expected by 18 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 17 Nov 2026, from Bath's recent extensions.

Site constraints 9

Green belt: Bath and Bristol
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape 54 m away: Mendip Hills
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
1 listed building within 150 m; Conservation area 37 m away: Chew Stoke; Radon affected area, class 4; Coalfield, development low risk area; Inside the Chew Stoke built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £775,000 in August 2026. Detached house, freehold.

3 August 2026£775,000
14 November 2014£445,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area184 m² (1,981 sq ft)
Energy ratingC (69 out of 100)
PropertyDetached house, 9 habitable rooms
Built1983 to 1990
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in February 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Full Application
Postcode
BS40 8XX
Received
23 Sept 2026
Validated
23 Sept 2026
Ward
Chew Valley
Parish
Chew Stoke
Case officer
Show
Target decision
18 Nov 2026
Applicant
Show
Agent
Bristol Design And Architecture Ltd

Decision outlook

Day 35 of the 56-day target. Bath usually decides extensions by day 55.

Day 3521 days to the 56-day target
60%decided within 8 weeks
97%approved
725decided in the last year

Plota live figures for extensions decided by Bath in the last twelve months, from validation. Bath decision record →

Consultation & key dates

Planning Portal ref
PP-15245516
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 councils
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications, ranking #236 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.