Land Off The Ridgeway New End Astwood Bank Data via plota.co.uk

W/26/00368/OL - Overhead Lines Decision - Other

Proposal

Installation of additional electricity pole within the existing overhead line Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Feb 2026
Decision
Target date was 14 Apr 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 254.

The consultation period closed on 5 Mar 2026.

Site constraints 7

Green belt: Birmingham
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; Inside the New End built-up area; Priority habitat about 44 m away: Traditional orchard; National infrastructure project about 1929 m away: Arrow Valley Solar, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wychavon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wychavon
Application type
Overhead Lines
Received
17 Feb 2026
Validated
17 Feb 2026
Ward
Inkberrow Ward
Parish
Cookhill
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Network Services (West Midlands)

Decision outlook

Day 254, past the statutory target. 87% of other in Wychavon are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 10 Sept 2026.

Day 254198 days past the 56-day target
69%decided within 8 weeks
95%approved
2,189decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Wychavon to go on. Wychavon decision record →

Consultation & key dates

Consultation
19 Feb 2026
Comments by
5 Mar 2026
Wychavon
Planning Authority Score
6.4/10
Average
#86 of 296 councils
Relevant to this application:
Householder decisions

Wychavon is one of the fastest councils in England for householder decisions, ranking #19 out of 296. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wychavon decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #202 of 296
91%
Householder approved
Above avg (90%) #186 of 296
88%
Decided in 8 weeks
Above avg (63%) #19 of 296
36%
Extended time limit
Below avg (41%) #117 of 296
65%
Minor dwellings approved
220 decided (1-9 homes)
98%
Major dwellings approved
42 decided (10+ homes)
91%
Change of use approved
54 decided
1,082
Total decisions
151 refused in the year to March 2026