Land east of Castle Road, Bury Data via plota.co.uk

73519 - Full Registered

Proposal

Hybrid application consisting of: (a) full planning application for 283 no. dwellings with associated works, and (b) outline planning application (site area 5.4 ha) for up to 120 no. dwellings including access with all other matters reserved Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
15 Oct 2026
✓
Consultation
16 Oct 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 27 Nov 2026 and 9 Dec 2026, from Bury's recent new homes.

Comments are open until 13 Nov 2026

Comment on this application ↗

Site constraints 8

Article 4 direction
Bury borough HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 72 m away: M60/M62/M66 Simister Island
The site is about 72 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Local nature reserve about 271 m away: Hollins Vale
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Coalfield, development low risk area; Air quality management area about 79 m away: Bury AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bury
Application type
Full
Received
7 Aug 2026
Validated
15 Oct 2026
Ward
Whitefield + Unsworth - Unsworth
Case officer
Show
Target decision
14 Jan 2027
Agent
Emery Planning

Decision outlook

Day 13 of the 91-day target. Bury usually decides new homes by day 50.

Day 1378 days to the 91-day target
71%decided within 8 weeks
59%approved
9%go to committee

Plota live figures for new homes decided by Bury in the last twelve months, from validation. Bury decision record →

Public comments

8comments received
7 objecting1 neutral

88% object · above the UK average of 74%

96 neighbours consulted · Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15033331
Planning Portal ref
PP-15033331
Neighbours
16 Oct 2026
Consultation
16 Oct 2026
Comments by
13 Nov 2026
Site or press notice
22 Oct 2026
Statutory expiry
14 Jan 2027
Env. assessment
No
Bury
Planning Authority Score
7.5/10
Good
#41 of 296 councils
Relevant to this application:
Householder decisions

Bury is faster than most councils at deciding householder applications, ranking #61 out of 296. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bury decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #191 of 296
94%
Householder approved
Above avg (90%) #99 of 296
76%
Decided in 8 weeks
Above avg (63%) #61 of 296
32%
Extended time limit
Below avg (41%) #64 of 296
59%
Minor dwellings approved
61 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
79%
Change of use approved
63 decided
757
Total decisions
109 refused in the year to March 2026