Olympia Exhibition Centre Hammersmith Road, London, W14 8UX Data via plota.co.uk

P/2026/01395/NMAT - Non-Material Amendment Submission REGISTERED: Under Assessment

Proposal

Non-material amendment to Condition 2 (Approved Drawings) to incorporate external alterations and amendments to the Olympia buildings and plots mainly G-Gate, Central, West Hall, National Hotel, Pillar Hall Grand and associated plant and public realm spaces and Condition 38 (Green Infrastructure) of Planning Permission ref. dated 31 October 2023). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 May 2026
✓
Validated
29 May 2026
Decision
Target date was 24 Jul 2026

Under consideration

No decision has been issued yet. A decision is expected by 24 Jul 2026.

The consultation period closed on 13 Aug 2026.

Documents 113

Plans & drawings 105

PDF Sitewide Section 96A PV Generation Report_P02.pdf Other Reports · 28 May 2026 View ↗ PDF S96A - CE Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF Central - Proposed Level 0G Floor Plan - OC-P-20-0G-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 01 Floor Plan - OC-P-20-01-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 01 Mezzanine Floor Plan - OC-P-20-1M-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 02 Floor Plan - OC-P-20-02-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 03 Floor Plan - OC-P-20-03-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 04 Floor Plan - OC-P-20-04-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 06 Floor Plan - OC-P-20-06-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 07 Floor Plan - OC-P-20-07-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 08 Floor Plan - OC-P-20-08-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 09 Floor Plan - OC-P-20-09-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 10 Floor Plan - OC-P-20-10-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 11 Floor Plan - OC-P-20-11-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 13 Floor Plan - OC-P-20-13-01-01-S4-P07.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed Level 14 Floor Plan - OC-P-20-14-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed NE Elevation - OC-P-25-XX-01-04-S4-P07.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed NW Elevation - OC-P-25-XX-01-03-S4-P07.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed Roof Floor Plan - OC-P-20-0R-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed SE Elevation - OC-P-25-XX-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed Section S1 - OC-P-26-XX-01-01-S4-P07.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed Section S2 - OC-P-26-XX-01-02-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed Section S3 - OC-P-26-XX-01-03-S4-P07.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Central - Proposed Site Plan - OC-P-00-OS-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Central - Proposed SW Elevation - OC-P-25-XX-01-02-S4-P07.pdf Proposed Drawings · 28 May 2026 View ↗ PDF G Gate - Proposed Site Plan - GG-P-00-OS-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed East Elevation - GG-P-25-XX-01-04-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 0G Floor Plan - GG-P-20-0G-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 02 Floor Plan - GG-P-20-02-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 03 Floor Plan - GG-P-20-03-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 04 Floor Plan - GG-P-20-04-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 05 Floor Plan - GG-P-20-05-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 06 Floor Plan - GG-P-20-06-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 07 Floor Plan - GG-P-20-07-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Level 10 Floor Plan - GG-P-20-10-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF G-Gate - Proposed Roof Floor Plan - GG-P-20-0R-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF G-Gate - Proposed Section S1 - GG-P-26-XX-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF G-Gate - Proposed South Elevation - GG-P-25-XX-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF G-Gate - Proposed West Elevation - GG-P-25-XX-01-02-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF S96A - GG Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF S96A - GR Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF S96A -ZZ Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 0G Floor Plan - ZZ-P-20-0G-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 01 Floor Plan - ZZ-P-20-01-01-01-S4-P07.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 01 Mezzanine Floor Plan - ZZ-P-20-1M-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 02 Floor Plan - ZZ-P-20-02-01-01-S4-P07.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 02 Mezzanine Floor Plan - ZZ-P-20-02M-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 03 Floor Plan - ZZ-P-20-03-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 04 Floor Plan - ZZ-P-20-04-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 05 Floor Plan - ZZ-P-20-05-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 06 Floor Plan - ZZ-P-20-06-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 07 Floor Plan - ZZ-P-20-07-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 08 Floor Plan - ZZ-P-20-08-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 09 Floor Plan - ZZ-P-20-09-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 10 Floor Plan - ZZ-P-20-10-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 11 Floor Plan - ZZ-P-20-11-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 12 Floor Plan - ZZ-P-20-12-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 13 Floor Plan - ZZ-P-20-13-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Level 14 Floor Plan - ZZ-P-20-14-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Roof Plan - ZZ-P-20-0R-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Masterplan - Proposed Site Plan - ZZ-P-00-OS-01-01-S4-P06.pdf Drawing · 28 May 2026 View ↗ PDF Masterplan - Proposed Streetscape SE Elevation - ZZ-P-25-XX-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Elevation (Front) - Proposed.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Masterplan - Proposed Streetscape SW Elevation - ZZ-P-25-XX-01-04-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF S96A - NA Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF National - Proposed Cladding Level 0G Canopy Partial Sections - NA-0G-DR-A-70702-S3-P02.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed Cladding Setting Out Geometry Level 01 Floor Plan - NA-01-DR-A-70003-S3-P01.pdf Drawing · 28 May 2026 View ↗ PDF National - Proposed Level 02 Floor Plan - ON-P-20-02-01-01-S2-P05.pdf Drawing · 28 May 2026 View ↗ PDF National - Proposed Level 05 Floor Plan - ON-P-20-05-01-01-S2-P05.pdf Drawing · 28 May 2026 View ↗ PDF National - Proposed NE Elevation - ON-P-25-XX-01-02-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed Roof Plan - ON-P-20-0R-01-01-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed SE Elevation - ON-P-25-XX-01-03-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed Section S2 - ON-P-26-XX-01-02-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed Section S3 - ON-P-26-XX-01-03-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF National - Proposed Site Plan - ON-P-00-OS-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF National - Proposed SW Elevation - ON-P-25-XX-01-04-S2-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF S96A - PH Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Level 0G Floor Plan - PH-P-20-0G-01-01-S4-P04.pdf Drawing · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Level 01 Floor Plan - PH-P-20-01-01-01-S4-P04.pdf Drawing · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Level 04 Floor Plan - PH-P-20-04-01-01-S4-P04.pdf Drawing · 28 May 2026 View ↗ PDF Pillar Hall - Proposed North Elevation - PH-P-25-XX-01-01-S4-P04.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Roof Plan - PH-P-20-0R-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Section S1 - PH-P-26-XX-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Pillar Hall - Proposed Site Plan - PH-P-00-OS-01-01-S4-P04.pdf Drawing · 28 May 2026 View ↗ PDF Pillar Hall - Proposed South Elevation - PH-P-25-XX-01-03-S4-P04.pdf Proposed Drawings · 28 May 2026 View ↗ PDF S96A - PR Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF Public Realm - Proposed Building S1 - PR-P-26-XX-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed Building S2 - PR-P-26-XX-01-02-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed East Elevation - PR-P-25-XX-01-02-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed Level 02 Floor Plan - PR-P-20-02-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Public Realm - Proposed Level 03 Floor Plan - PR-P-20-03-01-02-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Public Realm - Proposed North Sectional Elevation - PR-P-25-XX-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed Roof Plan - PR-P-20-0R-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed Site Plan - PR-P-00-OS-01-01-S4-P05.pdf Drawing · 28 May 2026 View ↗ PDF Public Realm - Proposed South Sectional Elevation - PR-P-25-XX-01-03-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF Public Realm - Proposed West Sectional Elevation - PR-P-25-XX-01-04-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF S96A - WE Comparison - Drawing list.pdf Other Reports · 28 May 2026 View ↗ PDF West -Proposed NE Elevation - OW-P-25-01-01-02-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed NW Elevation - OW-P-25-01-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed Roof Plan - OW-P-20-0R-01-01-S4-P06.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed SE Elevation - OW-P-25-01-01-03-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed Section S1 - OW-P-26-01-01-01-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed Section S2 - OW-P-26-01-01-02-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed Section S3 - OW-P-26-01-01-03-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗ PDF West -Proposed SW Elevation - OW-P-25-01-01-04-S4-P05.pdf Proposed Drawings · 28 May 2026 View ↗

All documents on the council site ↗

Associated applications 13

Site constraints 7

Grade II* listed: Grand Hall and Pillar Hall, Olympia Exhibition Centre
List entry 1096048 · 22 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Olympia and Avonmore conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 738 m away: Thames Tideway Tunnel
The site is 738 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area11,968 m² (128,822 sq ft)
Energy ratingA (asset rating 19)
UseHotels
HeatingAir Conditioning

From the energy performance certificate lodged in July 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment Submission
Postcode
W14 8UX
Received
28 May 2026
Validated
29 May 2026
Ward
Brook Green
Case officer
Show
Applicant
Show

Consultation & key dates

Consultation
23 Jul 2026
Comments by
13 Aug 2026
Statutory expiry
26 Jun 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.