Block A: 31-83 (odd) Dunlin Drive, Block B, Malin House, Block C, 8-36 (even) Cromarty House Block E… Data via plota.co.uk

MC/26/2048 - Full Application Registered

Proposal

Removal and replacement of existing cladding systems and associated facade components with non-combustible materials, installation of cavity barriers and fire-stopping, localised remediation to masonry and rendered wall systems, replacement and remediation of glazed spandrel panels, and associated ancillary works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 15 Dec 2026, from Medway's recent extensions.

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Otterham Creek to Stoke Marshes across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
SSSI 18 m away: Tower Hill to Cockham Wood SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Sssi
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Greater Thames Marshes; Flood defence 17 m away (wall, designed for a 1 in 1000 year flood); Ramsar wetland 476 m away: Medway Estuary & Marshes; Inside the Gillingham (Medway) built-up area; Priority habitat 19 m away: Mudflats.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 24 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Medway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Medway
Application type
Full Application
Postcode
ME4 3JL
Received
23 Oct 2026
Validated
23 Oct 2026
Ward
St Mary's Island
Target decision
18 Dec 2026
Decision level
Delegated
Applicant
Show
Agent
Planning Potential Ltd.

Decision outlook

Day 5 of the 56-day target. Medway usually decides extensions by day 53.

Day 551 days to the 56-day target
87%decided within 8 weeks
92%approved
500decided in the last year

Plota live figures for extensions decided by Medway in the last twelve months, from validation. Medway decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15232590
Planning Portal ref
PP-15232590
Env. assessment
No
Medway
Planning Authority Score
9.2/10
Excellent
#3 of 296 councils
Relevant to this application:
Householder decisions

Medway is one of the fastest councils in England for householder decisions, ranking #8 out of 296. Only 19% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Medway decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #99 of 296
96%
Householder approved
Above avg (90%) #53 of 296
94%
Decided in 8 weeks
Above avg (63%) #8 of 296
19%
Extended time limit
Below avg (41%) #16 of 296
79%
Minor dwellings approved
106 decided (1-9 homes)
78%
Major dwellings approved
27 decided (10+ homes)
75%
Change of use approved
67 decided
999
Total decisions
88 refused in the year to March 2026