26/1541/TELN - Telecomms Apparatus Notification Pending Consideration

Proposal

Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus, detailed as a 7M Light wooden pole Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Oct 2026
Decision
Expected by 1 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Nov 2026 and 27 Nov 2026, from Exeter's recent utility and infrastructure works.

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Exeter AQMA Order 2010
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Exeter built-up area; Priority habitat 45 m away: Coastal and floodplain grazing marsh.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 23 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exeter - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exeter
Application type
Telecomms Apparatus Notification
Postcode
EX4 2BN
Received
5 Oct 2026
Validated
5 Oct 2026
Ward
Exwick
Case officer
Show
Target decision
1 Dec 2026
Applicant
Show

Decision outlook

Day 24 of the 56-day target. Exeter usually decides utility and infrastructure works by day 46.

Day 2432 days to the 56-day target
77%decided within 8 weeks
80%approved
33decided in the last year

Plota live figures for utility and infrastructure works decided by Exeter in the last twelve months, from validation. Exeter decision record →

Public comments

No public comments yet.

Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
1 Dec 2026
Env. assessment
No
Exeter
Planning Authority Score
3.2/10
Poor
#228 of 296 councils
Relevant to this application:
Householder decisions

Exeter is slower than most councils at deciding householder applications, ranking #214 out of 296. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Exeter decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #205 of 296
86%
Householder approved
Below avg (90%) #242 of 296
54%
Decided in 8 weeks
Below avg (63%) #214 of 296
40%
Extended time limit
Below avg (41%) #150 of 296
58%
Minor dwellings approved
31 decided (1-9 homes)
60%
Major dwellings approved
5 decided (10+ homes)
90%
Change of use approved
40 decided
582
Total decisions
86 refused in the year to March 2026