12 Belvedere Road, Taunton Data via plota.co.uk

38/26/0224 - Full Planning Permission Pending

Proposal

Demolition of utility room with erection of single storey extension to the rear, dormer extension to the rear and installation of 2 No. roof lights to the front to increase from seven bedroom HMO to eight bedroom HMO at 12 Belvedere Road, Taunton Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
✓
Validated
11 Sept 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 15 Nov 2026, from Taunton Deane's recent extensions.

The consultation period closed on 2 Oct 2026.

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Tone Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
1 listed building within 150 m of the postcode pin; Local nature reserve about 493 m away: Children's Wood/Riverside Park; Inside the Taunton built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 14 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Taunton Deane - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Received
17 Jul 2026
Validated
11 Sept 2026
Parish
Taunton
Case officer
Show
Target decision
6 Nov 2026
Decision level
the Development Control Manager under delgated powers
Applicant
Show
Agent
NMB PROJECTS LTD

Decision outlook

Day 47 of the 56-day target. Taunton Deane usually decides extensions by day 58.

Day 4711 days to the predicted decision (day 58)
46%decided within 8 weeks
88%approved
143decided in the last year

Plota live figures for extensions decided by Taunton Deane in the last twelve months, from validation. Taunton Deane decision record →

Consultation & key dates

Consultation
11 Sept 2026
Comments by
2 Oct 2026