26/1394/FUL - Full Application Approved

Proposal

Single storey rear extension Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jul 2026
✓
Approved
26 Aug 2026

Approved on 26 Aug 2026 · Delegated Decision · Last checked 28 Aug 2026

Site constraints 5

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special protection area 158 m away: Pebblebed Heaths
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 180 m away: East Devon Pebblebed Heaths SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
National landscape 157 m away: East Devon.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX5 1EY
Received
15 Jul 2026
Validated
15 Jul 2026
Ward
Budleigh And Raleigh
Parish
Colaton Raleigh
Decision
Approval with conditions
Decision date
26 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
BWA Architecture ltd.

How this decision compares

Decided in 42 days from validation, 6 days faster than East Devon's median of 48 for extensions. Approved, as 95% of extensions here are.

74%decided within 8 weeks
95%approved
567decided in the last year

Plota live figures for extensions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

Last counted 28 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15039982
Planning Portal ref
PP-15039982
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026