Acton Sewage Works Warple Way Acton W3 0RG Data via plota.co.uk

Approved 252978CND
Appeal
Dismissed · 6 Feb 2026 · Written Representations · Inspectorate case 3375048 ↗
Council
Date received
4 Aug 2025
Date validated
4 Aug 2025
Postcode
W3 0RG

Description

Application for the partial discharge of requirement ACTST5 (Landscaping Works - hard surfacing / parking and circulation areas) and ACTST10 Surface water drainage of Schedule 3 of The Thames Water Utilities Limited (Thames Tideway Tunnel) Order (SI:) as amended by The Thames Water Utilities Limited (Thames Tideway Tunnel) (Correction) Order (SI:) and the Thames Water Utilities Limited (Thames Tideway Tunnel) (Amendment) Order 2017 (SI:), and the Notice of Variation No. 1 (17 March 2015) and Notice of Variation No.2 (17 August 2017) in respect of the Deemed Marine Licence. Data via plota.co.uk

Last checked

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Locally significant industrial site
A borough-level industrial site.
Boroughs protect these sites for industrial and related uses.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026