Drainllwynbir, Llanbister, Llandrindod Wells, LD1 6TG Data via plota.co.uk

P/26/0799/AGR - Prior notification Refused

Proposal

Agricultural storage building to provide cover over existing hardstanding. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
12 Aug 2026
✗
Refused
1 Sept 2026
Appeal
Not lodged

Refused on 1 Sept 2026 · Delegated Decision · Last checked 1 Sept 2026

Site constraints 3

Nutrient neutrality catchment: River Wye
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Powys - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Powys
Application type
Prior notification
Postcode
LD1 6TG
Received
7 Aug 2026
Validated
12 Aug 2026
Parish
Llanbister
Case officer
Show
Target decision
9 Sept 2026
Decision
AGR Planning Permission Required
Decision date
1 Sept 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 20 days from validation, 8 days faster than Powys's median of 28 for agricultural works. Refused, as 10% of agricultural works here are.

65%decided within 8 weeks
90%approved
160decided in the last year

Plota live figures for agricultural works decided by Powys in the last twelve months, from validation. Powys decision record →

Public comments

No public comments yet.

Last counted 1 Sept 2026

Read the comments on the council site ↗