Building 151 (Hospital), Okehampton Camp, Okehampton, Devon, EX20 1QP Data via plota.co.uk

0335/26 - Listed Building Consent Pending Consideration

Proposal

Replacement of aluminium sash windows with oak sash windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Sept 2026
✓
Validated
21 Oct 2026
Decision
Expected by 16 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 15 Dec 2026, from Dartmoor's recent extensions.

Documents 30

All documents on the council site ↗

Site constraints 7

Grade II listed: Okehampton Camp: Building 150, formerly the hospital staff accommodation block, and Building 151, formerly the hospital
List entry 1421827 · 7 m away · 1 more listed building within 150 m (1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other one with distances
Historic England ↗
Dartmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Special area of conservation 347 m away: Dartmoor; SSSI 347 m away: Wistman's Wood SSSI.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 27 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartmoor
Application type
Listed Building Consent
Postcode
EX20 1QP
Received
4 Sept 2026
Validated
21 Oct 2026
Ward
West Devon
Parish
Okehampton Hamlets
Case officer
Show
Target decision
16 Dec 2026
Decision level
Delegated decision
Applicant
Show
Agent
Concept

Decision outlook

Day 7 of the 56-day target. Dartmoor usually decides extensions by day 55.

Day 749 days to the 56-day target
66%decided within 8 weeks
89%approved
293decided in the last year

Plota live figures for extensions decided by Dartmoor in the last twelve months, from validation. Dartmoor decision record →

Consultation & key dates

Statutory expiry
16 Dec 2026