Pavement Outside Neptune Court The Strand Brighton Marina Brighton Data via plota.co.uk

BH2026/01626 - Full Planning Registered

Proposal

Installation of 1no streetlighting column to match existing lighting columns. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2026
✓
Validated
7 Sept 2026
✓
Consultation
7 Sept 2026
Decision
Expected by 2 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Nov 2026 and 21 Nov 2026, from Brighton and Hove's recent full applications.

The consultation period closed on 12 Oct 2026.

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Shoreham to Eastbourne across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 135 m away: Brighton to Newhaven Cliffs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Radon affected area, class 3; Nature improvement area: South Downs Way Ahead; National park about 361 m away: South Downs; Priority habitat about 7 m away: Saline lagoons; Inside the Brighton and Hove built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brighton and Hove - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning
Received
9 Jul 2026
Validated
7 Sept 2026
Ward
Whitehawk & Marina
Case officer
Show
Target decision
2 Nov 2026
Applicant
Show

Decision outlook

Day 51 of the 56-day target. Brighton and Hove usually decides full applications by day 66.

Day 5115 days to the predicted decision (day 66)
40%decided within 8 weeks
86%approved
6%go to committee

Plota live figures for full applications decided by Brighton and Hove in the last twelve months, from validation. Brighton and Hove decision record →

Public comments

No public comments yet.

Last counted 26 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
7 Sept 2026
Comments by
12 Oct 2026
Site or press notice
18 Sept 2026
Statutory expiry
2 Nov 2026
Env. assessment
No
Brighton and Hove
Planning Authority Score
4.3/10
Below average
#185 of 296 councils
Relevant to this application:
Householder decisions

Brighton and Hove is slower than most councils at deciding householder applications, ranking #238 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brighton and Hove decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #107 of 296
95%
Householder approved
Above avg (90%) #70 of 296
50%
Decided in 8 weeks
Below avg (63%) #238 of 296
46%
Extended time limit
Above avg (41%) #200 of 296
71%
Minor dwellings approved
189 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
63 decided
1,719
Total decisions
176 refused in the year to March 2026