Engineers Social Club28 Raby Roadhartlepoolts24 8AE Data via plota.co.uk

H/2026/0300 - Adjoining Authority Consultations Pending

Proposal

Adjoining authority re-consultation for erection of mixed use development comprising business centre and self storage storage facility (Sui Generis), including coffee shop (Class E) and 2no. retail units (Class E) at ground floor, and associated roof mounted solar, infrastructure, car parking, cycle stores, bin stores and landscaping works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Oct 2026
Decision
Expected by 11 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 25 Nov 2026 and 8 Dec 2026, from recent other across the UK.

Site constraints 6

Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
9 listed buildings within 150 m of the postcode pin
Nearest: K6 Telephone Kiosk 5 Metres East of Town Hall, Grade II, about 35 m from the postcode pin · 9 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 9 with distances
Historic England ↗
Also on the record
Radon affected area, class 2; Conservation area about 70 m away: Church; Heritage at risk about 70 m away: Church Street, Hartlepool; Inside the Hartlepool built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hartlepool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hartlepool
Application type
Adjoining Authority Consultations
Postcode
TS24 8AE
Received
14 Oct 2026
Validated
14 Oct 2026
Case officer
Show
Target decision
11 Nov 2026
Applicant
Show
Agent
HARTLEPOOL DEVELOPMENT CORPORATION

Decision outlook

Day 14 of the 56-day target. Councils usually decide other by day 50.

Day 1442 days to the 56-day target
71%decided within 8 weeks
95%approved
2,204decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Hartlepool to go on. Hartlepool decision record →

Hartlepool
Planning Authority Score
3.3/10
Poor
#223 of 296 councils
Relevant to this application:
Householder decisions

Hartlepool is slower than most councils at deciding householder applications, ranking #227 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hartlepool decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #55 of 296
93%
Householder approved
Above avg (90%) #129 of 296
52%
Decided in 8 weeks
Below avg (63%) #227 of 296
53%
Extended time limit
Above avg (41%) #240 of 296
91%
Minor dwellings approved
11 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
75%
Change of use approved
12 decided
224
Total decisions
15 refused in the year to March 2026