Land North West Of A82 Tyndrum Stirling Data via plota.co.uk

2026/0223/NST - Statutory Notification - overhead lines Current

Proposal

Installation of 2 no. single poles and section of overhead line Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Aug 2026
Decision
Expected by 20 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 26 Oct 2026 and 12 Nov 2026, from Loch Lomond's recent full applications.

Site constraints 2

Special area of conservation 222 m away: River Tay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Loch Lomond - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Statutory Notification - overhead lines
Received
20 Aug 2026
Validated
20 Aug 2026
Ward
Trossachs And Teith Ward
Parish
Strathfillan CC
Case officer
Show
Target decision
20 Oct 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 50 of the 56-day target. Loch Lomond usually decides full applications by day 78.

Day 5028 days to the predicted decision (day 78)
28%decided within 8 weeks
95%approved
66decided in the last year

Plota live figures for full applications decided by Loch Lomond in the last twelve months, from validation. Loch Lomond decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
20 Oct 2026
Env. assessment
No