Land North of the A372 and East of New Road, Othery, Bridgwater, Somerset, TA7 Data via plota.co.uk

38/25/00003 - Outline Planning Permission Approved at committee

Approved at planning committee on 14 July 2026, subject to a legal agreement. The council issues its decision notice once the agreement is signed.

Proposal

Outline application with some matters reserved, for the erection of up to 38 dwellings, erection of 71sqm flexible commercial floor space (Class E), public open space, drainage and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Mar 2025
✓
Committee
14 Jul 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 11 Dec 2025; it is now day 592.

A re-consultation started on 3 Jul 2026. The council has not yet published the new comment deadline.

Planning committee

Decided by Sedgemoor North on 14 Jul 2026. The council has not yet issued its decision notice.

Approved by 7 votes to 1

No officer report was published for this decision; this summary is from the committee minutes.

  • Othery Parish Council said the scheme was oversized for the village, in the wrong location and did not reflect local housing need.
  • Officers said the affordable housing was secured through a Section 106 agreement and could not simply be reduced later.
  • Councillors voted 7 to 1, with one abstention, to approve, with amended conditions protecting the neighbouring farm and requiring the pedestrian link before occupation.
Read how the committee decided The parish council's objections, the debate on affordable housing and conditions, and the vote to approve.

Source: Plota analysis of Sedgemoor's committee minutes of 14 Jul 2026.

Site constraints 8

Nutrient neutrality catchment: Parrett Catchment
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
2 listed buildings within 150 m of the postcode pin; Special protection area about 487 m away: Somerset Levels & Moors; SSSI about 474 m away: King's Sedgemoor SSSI; Inside the Othery built-up area; Priority habitat about 38 m away: Coastal and floodplain grazing marsh; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Outline Planning Permission
Received
17 Mar 2025
Validated
17 Mar 2025
Parish
Othery
Case officer
Show
Applicant
Show
Agent
Grass Roots Planning, Bristol North Baths

Decision outlook

Day 592, past the statutory target. 52% of outline applications in Sedgemoor are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 592501 days past the 91-day target
19%decided within 8 weeks
52%approved
26decided in the last year

Plota live figures for outline applications decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
3 Jul 2026
Comments by
11 Dec 2025