Oldland School Oldland Common South Gloucestershire BS30 9TH Data via plota.co.uk

P26/02380/OHLE - Overhead Lines Exempt Awaiting decision

Proposal

Application for consent under Section 37 of the Electricity Act 1989 for the removal of the current overhead line between 79GUGA7B to 79GUGA7A to be replaced by an underground section and two new terminal installations with supporting stay wires. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Oct 2026
Decision
Expected by 27 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 10 Dec 2026 and 19 Dec 2026, from South Gloucestershire's recent utility and infrastructure works.

Site constraints 4

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 16 m from the postcode pin (reference 367171-003).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Radon affected area, class 4; Inside the Kingswood and Fishponds built-up area; Green belt about 20 m away: Bath and Bristol.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 24 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Gloucestershire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Lines Exempt
Postcode
BS30 9TH
Received
16 Oct 2026
Validated
16 Oct 2026
Ward
Bitton And Oldland Common
Parish
Bitton Parish Council
Target decision
27 Nov 2026
Decision level
Fully Delegated

Decision outlook

Day 12 of the 56-day target. South Gloucestershire usually decides utility and infrastructure works by day 57.

Day 1245 days to the predicted decision (day 57)
50%decided within 8 weeks
93%approved
33decided in the last year

Plota live figures for utility and infrastructure works decided by South Gloucestershire in the last twelve months, from validation. South Gloucestershire decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
27 Nov 2026
Env. assessment
No
South Gloucestershire
Planning Authority Score
2.8/10
Poor
#239 of 296 councils
Relevant to this application:
Householder decisions

South Gloucestershire ranks #178 out of 296 councils for householder decision speed. South Gloucestershire is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Gloucestershire decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #210 of 296
83%
Householder approved
Below avg (90%) #263 of 296
61%
Decided in 8 weeks
Below avg (63%) #178 of 296
45%
Extended time limit
Above avg (41%) #195 of 296
75%
Minor dwellings approved
220 decided (1-9 homes)
93%
Major dwellings approved
15 decided (10+ homes)
84%
Change of use approved
105 decided
1,585
Total decisions
245 refused in the year to March 2026