The Gatehouse Lodge, Benwell Low Water Works Axwell Park View, Newcastle Upon Tyne Data via plota.co.uk

2025/1816/02/LBC - Approval of Details Reserved by Condition Pending Consideration

Proposal

Listed Building Application: Submission of details of all proposed work to the roof structures, including details of all proposed structural works, extent of roof replacement, together with samples of all materials to comply with condition 3, details of all proposed repairs and making good to existing stone work, to include details of the proposed mortar specification, mix and methodology, together with samples of all proposed stone work and mortar to comply with condition 4 and details of the replacement rain water goods, to include large scale details of their design, scale, method of attachment and finish to comply with condition 5 of Planning Permission 2025/1816/01/LBC dated 06-02-2026 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2026
Decision
Target date was 6 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 28 Oct 2026; it is now day 78.

Associated applications 2

Site constraints 6

Tree preservation order: Shepherd Thorn, Rastrick
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Also on the record
2 listed buildings within 150 m; Nature recovery project: Bradford and South Pennines; Radon affected area, class 2; Coalfield, development low risk area; Inside the Brighouse built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newcastle upon Tyne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Condition
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
Benwell, Scotswood and Denton Burn
Parish
Not Within A Parish Boundary
Case officer
Show
Target decision
6 Oct 2026
Decision level
Delegated decision
Applicant
Show
Agent
SW Architecture

Decision outlook

Day 78, past the statutory target. 76% of listed building works in Newcastle upon Tyne are decided within thirteen weeks, which runs to 10 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 27 Oct 2026.

Day 7822 days past the 56-day target
38%decided within 8 weeks
98%approved
187decided in the last year

Plota live figures for listed building works decided by Newcastle upon Tyne in the last twelve months, from validation. Newcastle upon Tyne decision record →

Consultation & key dates

Statutory expiry
6 Oct 2026
Newcastle upon Tyne
Planning Authority Score
4.9/10
Below average
#154 of 296 councils
Relevant to this application:
Major dwellings

Newcastle upon Tyne is slower than most councils at deciding householder applications, ranking #205 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newcastle upon Tyne decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #113 of 296
95%
Householder approved
Above avg (90%) #86 of 296
56%
Decided in 8 weeks
Below avg (63%) #205 of 296
42%
Extended time limit
Above avg (41%) #165 of 296
84%
Minor dwellings approved
37 decided (1-9 homes)
95%
Major dwellings approved
22 decided (10+ homes)
71%
Change of use approved
70 decided
1,005
Total decisions
103 refused in the year to March 2026