Pitt House Chudleigh Devon TQ13 0EL Data via plota.co.uk

26/01150/LBC - Listed Building Consent Pending Consideration

Proposal

Roof repairs including slate replacement where necessary, renewal of defective leadwork and flashings and waterproofing of existing flat roof areas Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
✓
Validated
27 Oct 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 16 Dec 2026, from Teignbridge's recent extensions.

Site constraints 8

Grade II* listed: Pitt House
List entry 1165950 · 4 m away · 2 more listed buildings within 150 m (2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Special area of conservation 457 m away: South Hams; SSSI 457 m away: Chudleigh Caves and Woods SSSI; Inside the Chudleigh Knighton built-up area; Priority habitat 41 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Teignbridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
TQ13 0EL
Received
17 Jul 2026
Validated
27 Oct 2026
Ward
Chudleigh
Parish
HENNOCK
Case officer
Show
Target decision
22 Dec 2026
Applicant
Show
Agent
HOMZ UK

Decision outlook

Day 2 of the 56-day target. Teignbridge usually decides extensions by day 50.

Day 254 days to the 56-day target
91%decided within 8 weeks
85%approved
315decided in the last year

Plota live figures for extensions decided by Teignbridge in the last twelve months, from validation. Teignbridge decision record →

Public comments

No public comments yet.

Last counted 28 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15091599
Planning Portal ref
PP-15091599
Statutory expiry
22 Dec 2026
Env. assessment
No
Teignbridge
Planning Authority Score
6.1/10
Average
#102 of 296 councils
Relevant to this application:
Other decisions

Teignbridge is faster than most councils at deciding householder applications, ranking #39 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Teignbridge is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Teignbridge decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #262 of 296
82%
Householder approved
Below avg (90%) #270 of 296
80%
Decided in 8 weeks
Above avg (63%) #39 of 296
26%
Extended time limit
Below avg (41%) #37 of 296
60%
Minor dwellings approved
83 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
13 decided
716
Total decisions
141 refused in the year to March 2026